Related Experiment Video
Updated: Dec 27, 2025

Preparing an Isotopically Pure 229Th Ion Beam for Studies of 229mTh
Published on: May 3, 2019
Achievement of stable negative ion production with Cs-seeded for long pulse beam operation in the prototype of
Masahiro Ichikawa1, Atsushi Kojima1, Junichi Hiratsuka1
1National Institute for Quantum and Radiological Science and Technology, 801-1, Mukoyama, Naka 311-0193, Japan.
Abstract:
Long pulse negative ion beams of 500 keV and 154 A/m2 for 118 s have been achieved for the first time, which exceeds the requirement of the JT-60SA negative ion source. In order to solve the issues of such long pulse beams, the fast cutoff system of the power supply aims to reduce the surge current and to extend the lifetime of filaments and the suppression method of excess cesium (Cs) accumulation on the plasma grid (PG) to achieve stable negative ion production. By developing the fast cutoff system using a field programmable gate array unit for the arc power supply, the cutoff time has been reduced to 1/10 that of the original system and the lifetime of the filament was extended by three times. In order to achieve stable negative ion production, incoming Cs on the PG surface has been reduced by keeping the chamber wall temperature below 40 °C. As a result, a stable beam current drift of <6% has been achieved for the 118 s duration.
Related Concept Videos
Inductively Coupled Plasma Atomic Emission Spectroscopy: Principle
The ions and electrons produced interact with the fluctuating magnetic field created by a water-cooled...
Inductively Coupled Plasma–Mass Spectrometry (ICP–MS): Overview
Inductively Coupled Plasma Atomic Emission Spectroscopy: Instrumentation
There are three main types of inductively coupled plasma atomic emission spectroscopy (ICP-AES) instruments: sequential, simultaneous multichannel, and Fourier transform instruments, with the latter being less commonly used....

