Related Experiment Video
Updated: Dec 26, 2025

Optimized Management of Endovascular Treatment for Acute Ischemic Stroke
Published on: January 18, 2018
Assessment of the Implementation of Critical Pathway in Stroke Patients: A 10-Year Follow-Up Study
Yun Jeong Jang1,2, Dahye Park1,2, Hyeong Seop Kim1,2
1Department of Rehabilitation Medicine, Gyeongsang National University School of Medicine and Gyeongsang National University Hospital, Jinju 52727, Republic of Korea.
Background:
The complications after stroke inhibit functional recovery and worsen the prognosis of patients. The implementation of a critical pathway (CP) can facilitate functional recovery after stroke by enabling comprehensive and systematic structured rehabilitation.
Objective:
To evaluate the effects of the implementation of CP in stroke patients for 10 years.
Methods:
The data were collected from 960 patients who were diagnosed with a stroke at the university hospital emergency room, who were transferred to the rehabilitation center after the acute phase, and who were discharged after undergoing comprehensive rehabilitation. Based on data collected over a period of 10 years, changes in demographic and stroke characteristics, preexisting medical conditions, poststroke complications, and functional states, as well as length of stay (LOS), were evaluated before and after CP implementation. The modified Rankin Scale (mRS) and the Korean version of the Modified Barthel Index (K-MBI) were used to evaluate functional states.
Results:
There were no significant differences in demographic and stroke characteristics before and after CP implementation. For those with preexisting medical conditions, there was no significant difference between before and after CP implementation. The majority of the complications were significantly decreased after the implementation of CP. Except for hemorrhagic stroke patients, the Brunnstrom stage in the ischemic and total stroke patients after CP implementation was significantly increased in the upper and lower extremities. The total hospitalization LOS and rehabilitation center hospitalization times were significantly reduced in ischemic and total stroke patients. There was no statistically significant difference in the functional gain of K-MBI and the efficiency of rehabilitation between before and after CP implementation.
Conclusion:
The implementation of CP allows for better application of evidence- and guideline-based key interventions and helps to provide early, comprehensive, organized, and more specialized care to stroke patients. Despite limited evidence, CP is still recommended as a means of promoting best practices in hospital care for stroke patients.
More Related Videos
Related Concept Videos
Coronary Artery Disease V: Interprofessional Care
Peripheral Artery Disease III: Interprofessional Care
Acute Coronary Syndrome IV: Interprofessional Care
Peripheral Artery Disease IV: Nursing Management
Acute Coronary Syndrome III: Diagnostic Studies

