Related Experiment Video
Updated: Dec 24, 2025

Performing Microscope-Mounted Y-Shaped Cutting Tests
Published on: January 20, 2023
Research on stress release for the gob-side roadway using the roof-cutting technology with a chainsaw arm
Yang Tai1, Bin Yu2, Binwei Xia3
1School of Mines, China University of Mining and Technology, Xuzhou 221116, People's Republic of China.
Abstract:
The narrow pillar mining method is widely adopted for working faces in coal mines. However, in cases of an overlying hard roof, a suspended triangle roof plate or a cantilever will be formed near the goaf. At this point, the coal pillar extrusion and serious deformation will occur in the gob-side roadway. In order to mitigate the problem, the roof-cutting technology with a chainsaw arm and its equipment have been developed. In this paper, based on the analysis of deformation and failure characteristics of 2312 roadway, which is close to the goaf of 2311 working face in Tashan Coal, the roof-cutting technology with a chainsaw arm was chosen to be applied in 2311 roadway. Then, the roof-cutting process and the load acting on the coal pillar were discussed and analysed. A numerical model was established to analyse the stress releasing effects after roof cutting. Moreover, the roof-cutting height and the support parameters of the roadway were optimized through numerical analysis and the results manifested that the roof cutting was the most effective when the roof-cutting height was 6.4 m. After roof cutting, the vertical stresses within the coal pillars were lowered by about 25.0%. Finally, the roof-cutting experiment was carried out in the 2311 roadway in Tashan Coal Mine. The on-site roof-cutting depth was 6.4 m and the roof-cutting width was 42 mm guided by the numerical analysis. To verify the stress-relieving effects, the borehole stress meters were applied to monitor the peak advancing stresses of narrow pillars at various depths. The measured results indicated that the peak advancing stresses decreased by 22.8% on average, and therefore, roof cutting and stress releasing effects were achieved.
Related Concept Videos
Applications of Stress
The...
Brick Cutting Techniques
Cut bricks are categorized by size. Bricks cut to half their original length are called half-bats, while those cut to three-fourths their length are known as three-fourth bats.
Special types of...
Quarrying of Stone
One common method involves using a diamond belt saw to cut large blocks from the quarry face. These blocks can be about 50 feet long and 12 feet high. After the initial vertical cut, drilling is performed at the base of the...
Stresses under Combined Loadings
The process begins by slicing the tube at critical points and analyzing the internal forces and stress components at these sections, focusing on the centroid. Normal stresses, generated by axial forces and bending moments, are either compressive or tensile and vary across the section from...
Posttensioned Masonry Walls
Post-tensioned masonry walls use high-strength steel rods or flexible tendons to enhance the strength and efficiency of masonry structures. These elements are securely anchored to the foundation and extend vertically either within the cores of the masonry units or between the masonry wythes. The construction process involves building the wall with these tensioning elements in place and allowing the mortar to fully cure.
Following the curing process, the tensioning begins. Steel rods are...
Steel Fastening Techniques
Rivets are cylindrical steel fasteners with a specially designed head. During application, rivets are heated until white-hot and then inserted through pre-drilled holes in the steel sections. A pneumatic hammer is used to shape the exposed end into a second head, securing the sections together.
Bolting is another...

