Data needed for assessing water footprint of steel production

Reza Nezamoleslami1, S Mahdi Hosseinian1

  • 1Department of Civil Engineering, School of Engineering, Bu-Ali Sina University, Iran.

Data in Brief
|April 18, 2020
PubMed

Related Concept Videos

Steel Manufacturing01:26

Steel Manufacturing

Steel manufacturing is a multi-stage process that begins by smelting iron ore into cast iron in a blast furnace. This initial stage involves layering iron ore with coke, a type of fuel, and crushed limestone within the furnace. The coke is ignited with a high volume of air, leading to the creation of carbon monoxide, which acts to reduce the iron ore to pure iron.
During this smelting process, limestone plays a crucial role by forming slag. Slag captures impurities within the molten iron, such...
1.3K
Mechanical Characteristics of Steel01:18

Mechanical Characteristics of Steel

The mechanical characteristics of steel are assessed through various tests that evaluate its strength, toughness, and flexibility. These tests include tension, torsion, impact, bending, and hardness assessments, each providing crucial information about steel's suitability for specific applications.
The tension test is fundamental for determining tensile strength. In this test, a steel specimen is stretched using a gripping device until it breaks. The data collected during this test are used...
957
Structural Steel Products01:24

Structural Steel Products

Structural steel products are created within a structural mill. The process begins with a beam blank that is reheated and then fed through a series of rollers. These rollers progressively shape the metal into its final form. Adjusting the spacings between the rollers allows for the production of different sections with the same nominal dimensions.
Once shaped, the steel's final form emerges as a continuous length, which is then segmented by a hot saw into manageable pieces. These segments...
577
Testing Water Quality01:14

Testing Water Quality

When the quality of water for concrete preparation is uncertain, its impact on the setting time of cement and compressive strength of mortar is assessed by comparison with de-ionized or distilled water benchmarks. American Society for Testing and Materials (ASTM) C1602 requires the setting times to be within 90 minutes of the control, British Standard (BS) 3146:1980 allows a 30-minute variance in the initial setting, while British Standards European Norm (BS EN) 1008 specifies initial setting...
301
Quality of Water01:19

Quality of Water

In concrete preparation, the quality of water is paramount as it affects the strength and durability of the concrete. Potable water is usually preferred; however, it must not have excessive sodium or potassium to prevent compromising the concrete's integrity. Water quality is typically evaluated based on impurities such as dissolved solids, chlorides, and sulfates, and its pH value is ideally between 6 and 8. Even slightly acidic natural water may be acceptable unless it contains harmful...
439
Steel Fastening Techniques01:17

Steel Fastening Techniques

Steel sections can be joined together through various fastening techniques including riveting, bolting, and welding, each suitable for different structural requirements and conditions.
Rivets are cylindrical steel fasteners with a specially designed head. During application, rivets are heated until white-hot and then inserted through pre-drilled holes in the steel sections. A pneumatic hammer is used to shape the exposed end into a second head, securing the sections together.
Bolting is another...
1.2K