Related Experiment Videos
An Approach towards Increasing Prediction Accuracy for the Recovery of Missing IoT Data Based on the GRNN-SGTM
Roman Tkachenko1, Ivan Izonin1, Natalia Kryvinska2,3
1Department of Publishing Information Technologies, Lviv Polytechnic National University, 12 Bandera str., 79000 Lviv, Ukraine.
Abstract:
The purpose of this paper is to improve the accuracy of solving prediction tasks of the missing IoT data recovery. To achieve this, the authors have developed a new ensemble of neural network tools. It consists of two successive General Regression Neural Network (GRNN) networks and one neural-like structure of the Successive Geometric Transformation Model (SGTM). The principle of ensemble topology construction on two successively connected general regression neural networks, supplemented with an SGTM neural-like structure, is mathematically substantiated, which improves the accuracy of prediction results. The effectiveness of the method is based on the replacement of the summation of the results of the two GRNNs with a weighted summation, which improves the accuracy of the ensemble operation in general. A detailed algorithmic implementation of the ensemble method as well as a flowchart of its operation is presented. The parameters of the ensemble operation are determined by optimization using the brute-force method. Based on the developed ensemble method, the solution of the task of completing the partially missing values in the real monitoring dataset of the air environment collected by the IoT device is presented. By comparing the performance of the developed ensemble with the existing methods, the highest accuracy of its performance (by the parameters of Mean Absolute Percentage Error (MAPE) and Root Mean Squared Error (RMSE) accuracy) among the most similar in this class has been proved.
Related Concept Videos
End Point Prediction: Gran Plot
For potentiometric titration, the Gran plot is created by plotting...
Survival Tree
Building a Survival Tree
Constructing a...
Prediction Intervals
However, the point estimate is most likely not the exact value of the population parameter, but close to it. After calculating point estimates, we construct interval estimates, called confidence intervals or prediction intervals. This prediction interval comprises a range of values unlike the point estimate and is a better predictor of the observed sample value, y.
Improving Translational Accuracy
Improving Translational Accuracy