Are collision and crossing course surrogate safety indicators transferable? A probability based approach using

Attila Borsos1, Haneen Farah2, Aliaksei Laureshyn3

  • 1University of Győr, Department of Transport Infrastructure and Water Resources Engineering, Egyetem tér 1, Győr 9026, Hungary.

Summary

This study compares safety indicators like time-to-collision (TTC) and T2 for analyzing near-miss situations. Results show these indicators are transferable, with stricter thresholds for T2 and Peak over Threshold (POT) yielding better safety analysis results.

Related Concept Videos

Probability in Statistics01:14

Probability in Statistics

Probability is the likelihood of an event occurring. The term event is defined as a collection of results of a procedure. An event is a simple event when an outcome cannot be divided into simpler parts.
An example of a simple event is a coin toss. The result of a coin toss is either a head or a tail. Here, head and tail are two simple events. These two simple events make up the sample space. Further, the probability of an event occurring falls within the range of 0 to 1. The probability of an...
21.3K
Design Example: Analyzing Capacity Contours for Flood Risk Assessment01:17

Design Example: Analyzing Capacity Contours for Flood Risk Assessment

Flood risk assessment involves careful planning and analysis to ensure the safety of communities near water retention structures. Capacity contours are a vital tool in this process, as they illustrate the potential spread of water at specific levels in a given area. In the context of building a bund across a small valley, these contours play a critical role in evaluating the safety of nearby residential areas.In this example, the bund is intended to store stormwater in the valley. The engineers...
235
Determination of Expected Frequency01:08

Determination of Expected Frequency

Suppose one wants to test independence between the two variables of a contingency table. The values in the table constitute the observed frequencies of the dataset. But how does one determine the expected frequency of the dataset? One of the important assumptions is that the two variables are independent, which means the variables do not influence each other. For independent variables, the statistical probability of any event involving both variables is calculated by multiplying the individual...
2.5K
Hazard Rate01:11

Hazard Rate

The hazard rate, also known as the hazard function or failure rate, is a statistical measure used to describe the instantaneous rate at which an event occurs, given that the event has not yet happened. From a probabilistic perspective, it represents the likelihood that a subject will experience the event in a very small time interval, conditional on surviving up to the beginning of that interval. In terms of frequency, the hazard rate can be viewed as the ratio of the number of events to the...
335
Propagation of Uncertainty from Random Error00:59

Propagation of Uncertainty from Random Error

An experiment often consists of more than a single step. In this case, measurements at each step give rise to uncertainty. Because the measurements occur in successive steps, the uncertainty in one step necessarily contributes to that in the subsequent step. As we perform statistical analysis on these types of experiments, we must learn to account for the propagation of uncertainty from one step to the next. The propagation of uncertainty depends on the type of arithmetic operation performed on...
1.6K
Propagation of Uncertainty from Systematic Error01:10

Propagation of Uncertainty from Systematic Error

The atomic mass of an element varies due to the relative ratio of its isotopes. A sample's relative proportion of oxygen isotopes influences its average atomic mass. For instance, if we were to measure the atomic mass of oxygen from a sample, the mass would be a weighted average of the isotopic masses of oxygen in that sample. Since a single sample is not likely to perfectly reflect the true atomic mass of oxygen for all the molecules of oxygen on Earth, the mass we obtain from this...
1.2K