Related Experiment Video
Updated: Dec 16, 2025

Modifying the Bank Erosion Hazard Index BEHI Protocol for Rapid Assessment of Streambank Erosion in Northeastern Ohio
Published on: February 13, 2015
Prioritising earthquake retrofitting in Wellington, New Zealand
Thoa Hoang1, Ilan Noy2, Olga Filippova3
1PhD student in economics at Wellington School of Business and Government, Victoria University of Wellington, New Zealand.
Abstract:
This study describes the application of multi-criteria decision analysis (MCDA) to prioritise the seismic risk mitigation of existing buildings in earthquake-prone Wellington, New Zealand. Through retrofitting or demolition, this is an important requirement in many cities around the Pacific Rim and in other high-level seismic hazard locations. The prioritisation strategy proposed here, based on MCDA methods, can provide decision-makers with a fast and reliable support tool for identifying the optimal sequencing of their retrofitting programmes. The premise of the MCDA analysis presented in this paper is that there are multiple criteria that determine societal prioritisation preferences; these are limited not just to life safety (often the explicit/exclusive priority of governments) and commercial value (the main concern of many building owners). The study demonstrates how different measures, within four general criteria-life safety and geo-spatial, economic, and socio-cultural roles-can be operationalised as a viable framework for establishing intervention policy priorities.
Related Concept Videos
Applications of GIS: Disaster Management and Emergency Response
Design Example: Sustainability in Concrete Building
There are multiple approaches to achieve sustainability in a commercial concrete building. For instance, construct a concrete parking area under the building, utilizing pervious concrete paver blocks in open areas to facilitate rainwater collection through an underground...
Insulation Coordination
Design Consideration
The factor of safety is another key...
Design Example: Analyzing Capacity Contours for Flood Risk Assessment
Workability of Concrete
Concrete's workability is determined by its resistance to internal forces that arise...

