Abstract:
In this article, a novel distributed fuzzy load frequency control (LFC) approach is investigated for multiarea power systems under cross-layer attacks. The nonlinear factors existing in turbine dynamics and governor dynamics as well as the uncertain parameters therein are modeled and analyzed under the interval type-2 (IT2) Takagi-Sugeno (T-S) fuzzy framework. The cross-layer attacks threatening the stability of power systems are considered and modeled as an independent Bernoulli process, including denial-of-service (DoS) attacks in the cyber layer and phasor measurement unit (PMU) attacks in the physical layer. By using the Lyapunov theory, an area-dependent Lyapunov function is proposed and the sufficient conditions guaranteeing the system's asymptotically stability with the area control error (ACE) signals satisfying H∞ performance are deduced. In simulations, we adopt a four-area power system to verify the resiliency enhancement of the presented distributed fuzzy control strategy against random cross-layer DoS attacks. Results show that the designed resilient controller can effectively regulate the load frequency under different cross-layer DoS attack probabilities.
Related Concept Videos
Load-frequency control
Reclosers and Fuses
A comprehensive protection scheme for radial distribution...
Fast Decoupled and DC Powerflow
Line Protection with Impedance Relays
Under normal conditions, low load currents keep the measured...
Zones of Protection
Protective zones are defined by closed dashed lines, containing one or more components. A key characteristic of these zones is the strategic placement of...
Radial System Protection
In a radial system with a fault downstream of the third breaker, ideally, only the third breaker will open, isolating the fault and interrupting the load connected beyond it. The second breaker has a longer delay setting,...