Application of end-of-shift respirable crystalline silica monitoring to construction

Chih-Hsiang Chien1, Gan Huang1, Benjamin Lopez1

  • 1Department of Environmental Engineering Sciences, University of Florida, Gainesville, Florida.

Related Concept Videos

Design Example: Managing Concrete Workability01:14

Design Example: Managing Concrete Workability

This example deals with managing the workability of concrete for a raft foundation project under hot weather conditions. Workability is crucial for ensuring the concrete is easy to place, compact, and finish. In this scenario, a slump test — a common method to measure the workability of fresh concrete — initially indicated low workability. This was attributed to the rapid water loss from the concrete mix, exacerbated by the high temperatures causing the course aggregates to heat up.
207
Quarrying of Stone01:15

Quarrying of Stone

Quarrying is the process of extracting stone from a quarry, where specialized techniques are employed to remove large blocks of stone safely and efficiently. This process can involve controlled explosions or more precision-oriented methods such as cutting and drilling.
One common method involves using a diamond belt saw to cut large blocks from the quarry face. These blocks can be about 50 feet long and 12 feet high. After the initial vertical cut, drilling is performed at the base of the...
379
Deleterious Substances in Aggregate01:25

Deleterious Substances in Aggregate

Deleterious substances in aggregates can be detrimental to the quality and durability of concrete. These substances include organic impurities like loam, which interfere with cement hydration and are usually present in the sand. These prevent a good bond between aggregate and cement paste. Organic impurities can be detected using the colorimetric test, where the darkness of a solution after agitation indicates the level of organic content.
Another type of impurity is clay and fine material that...
416
Survey Safety01:28

Survey Safety

Surveying near highways, rough terrain, or power lines involves significant risks. Working along highways is particularly dangerous and requires the use of warning signs and flagmen. It is safest to avoid working directly on roads and use offsets whenever possible. When highway work is unavoidable, it must follow all safety guidelines. Surveyors should wear bright clothing, such as orange reflective vests, to ensure visibility to motorists, coworkers, and hunters. In construction zones, wearing...
303
Preplaced Aggregate Concrete01:29

Preplaced Aggregate Concrete

Preplaced aggregate concrete is ideal for construction environments that are not easily accessible. The process begins by properly wetting the gap-graded coarse aggregates to remove the dirt, then placing it in the form and compacting it. Voids are filled with a mortar mix pumped under pressure through slotted pipes. This mortar typically consists of Portland cement, pozzolan, fine aggregates, water, and a fluidizing aid. The pozzolan helps reduce bleeding and segregation while improving the...
257
Sieve Analysis and Grading Curves01:19

Sieve Analysis and Grading Curves

Sieve analysis is a method used to determine the particle size distribution of aggregate materials. This process involves the following steps:
795