Related Experiment Video
Updated: Dec 12, 2025

Comprehensive & Cost Effective Laboratory Monitoring of HIV/AIDS: an African Role Model
Published on: October 31, 2010
Institutionalized data quality assessments: a critical pathway to improving the accuracy of integrated disease
Charles Njuguna1, Mohamed Vandi2, Malimbo Mugagga3
1World Health Organization Sierra Leone, Freetown, Sierra Leone. njugunach@who.int.
Background:
Public health agencies require valid, timely and complete health information for early detection of outbreaks. Towards the end of the Ebola Virus Disease (EVD) outbreak in 2015, the Ministry of Health and Sanitation (MoHS), Sierra Leone revitalized the Integrated Disease Surveillance and Response System (IDSR). Data quality assessments were conducted to monitor accuracy of IDSR data.
Methods:
Starting 2016, data quality assessments (DQA) were conducted in randomly selected health facilities. Structured electronic checklist was used to interview district health management teams (DHMT) and health facility staff. We used malaria data, to assess data accuracy, as malaria was endemic in Sierra Leone. Verification factors (VF) calculated as the ratio of confirmed malaria cases recorded in health facility registers to the number of malaria cases in the national health information database, were used to assess data accuracy. Allowing a 5% margin of error, VF < 95% were considered over reporting while VF > 105 was underreporting. Differences in the proportion of accurate reports at baseline and subsequent assessments were compared using Z-test for two proportions.
Results:
Between 2016 and 2018, four DQA were conducted in 444 health facilities where 1729 IDSR reports were reviewed. Registers and IDSR technical guidelines were available in health facilities and health care workers were conversant with reporting requirements. Overall data accuracy improved from over- reporting of 4.7% (VF 95.3%) in 2016 to under-reporting of 0.2% (VF 100.2%) in 2018. Compared to 2016, proportion of accurate IDSR reports increased by 14.8% (95% CI 7.2, 22.3%) in May 2017 and 19.5% (95% CI 12.5-26.5%) by 2018. Over reporting was more common in private clinics and not- for profit facilities while under-reporting was more common in lower level government health facilities. Leading reasons for data discrepancies included counting errors in 358 (80.6%) health facilities and missing source documents in 47 (10.6%) health facilities.
Conclusion:
This is the first attempt to institutionalize routine monitoring of IDSR data quality in Sierra Leone. Regular data quality assessments may have contributed to improved data accuracy over time. Data compilation errors accounted for most discrepancies and should be minimized to improve accuracy of IDSR data.
More Related Videos
09:33Visualizing Field Data Collection Procedures of Exposure and Biomarker Assessments for the Household Air Pollution Intervention Network Trial in India
Published on: December 23, 2022
19:57An Affordable HIV-1 Drug Resistance Monitoring Method for Resource Limited Settings
Published on: March 30, 2014
Related Concept Videos
Principles of Disease Surveillance
Data Validation
Nursing assessment guides are generally based on holistic models rather than medical...
Quality Assurance
Statistical Software for Data Analysis and Clinical Trials
Data Reporting and Recording
Statistical Methods for Analyzing Epidemiological Data