Towards a Routine External Evaluation Protocol for Small Area Estimation

Alan H Dorfman1

  • 1Bethesda, Maryland 20814, USA.

Summary

Evaluating small area estimation (SAE) success requires a protocol. We propose a Routine External Evaluation Protocol to ensure accurate results and sound inference in SAE surveys.

Related Concept Videos

One-Compartment Open Model: Wagner-Nelson and Loo Riegelman Method for ka Estimation01:24

One-Compartment Open Model: Wagner-Nelson and Loo Riegelman Method for ka Estimation

This lesson introduces two critical methods in pharmacokinetics, the Wagner-Nelson and Loo-Riegelman methods, used for estimating the absorption rate constant (ka) for drugs administered via non-intravenous routes. The Wagner-Nelson method relates ka to the plasma concentration derived from the slope of a semilog percent unabsorbed time plot. However, it is limited to drugs with one-compartment kinetics and can be impacted by factors like gastrointestinal motility or enzymatic degradation.
On...
1.0K
Estimation of the Physical Quantities01:05

Estimation of the Physical Quantities

On many occasions, physicists, other scientists, and engineers need to make estimates of a particular quantity. These are sometimes referred to as guesstimates, order-of-magnitude approximations, back-of-the-envelope calculations, or Fermi calculations. The physicist Enrico Fermi was famous for his ability to estimate various kinds of data with surprising precision. Estimating does not mean guessing a number or a formula at random. Instead, estimation means using prior experience and sound...
7.0K
Area Computation by the Alternative Coordinate Method01:24

Area Computation by the Alternative Coordinate Method

The alternative coordinate method, also known as the Shoelace Formula, is a technique for determining the area of a traverse using Cartesian coordinates. This method relies on the sequential arrangement of x and y coordinates for each point of the shape, ensuring accuracy and ease of application.In this approach, each corner's x and y coordinates are listed as fractions, with the x-coordinate as the numerator and the y-coordinate as the denominator. These coordinates are arranged sequentially...
407
Estimating Population Standard Deviation01:26

Estimating Population Standard Deviation

When the population standard deviation is unknown and the sample size is large, the sample standard deviation s is commonly used as a point estimate of σ. However, it can sometimes under or overestimate the population standard deviation. To overcome this drawback, confidence intervals are determined to estimate population parameters and eliminate any calculation bias accurately. However, this only applies to random samples from normally distributed populations. Knowing the sample mean and...
3.2K
Areas Within Irregular Boundaries01:26

Areas Within Irregular Boundaries

Calculating areas within irregular boundaries, such as along rivers or curved roads, is crucial in various fields, including surveying, engineering, and environmental management. Surveyors often begin by creating a traverse, a connected series of straight lines approximating the area's boundary. The coordinates of each traverse point are essential for calculating the enclosed area. The double meridian distance formula is a widely used technique for this purpose. This method utilizes the...
263
Estimating Population Mean with Unknown Standard Deviation01:22

Estimating Population Mean with Unknown Standard Deviation

In practice, we rarely know the population standard deviation. In the past, when the sample size was large, this did not present a problem to statisticians. They used the sample standard deviation s as an estimate for σ and proceeded as before to calculate a confidence interval with close enough results. However, statisticians ran into problems when the sample size was small. A small sample size caused inaccuracies in the confidence interval.
William S. Gosset (1876–1937) of the...
8.6K