Related Experiment Video
Updated: Dec 11, 2025

Mesocosm-Scale Constructed Wetland Design for Wastewater Treatment
Published on: May 2, 2025
Removal of tri-(2-chloroisopropyl) phosphate (TCPP) by three types of constructed wetlands
Pan Qin1, Shaoyong Lu1, Xiaohui Liu2
1State Environmental Protection Scientific Observation and Research Station for Lake Dongtinghu (SEPSORSLD), National Engineering Laboratory for Lake Pollution Control and Ecological Restoration, State Key Laboratory of Environmental Criteria and Risk Assessment, Research Centre of Lake Environment, Chinese Research Academy of Environmental Sciences, Beijing 100012, China; College of Water Sciences, Beijing Normal University, Beijing 100875, China.
Abstract:
In this study, three types of constructed wetlands (CWs) (biofilm-attachment-surface-CWs, packed bed-CWs and traditional-CWs) were assembled to comparatively evaluate their ability and mechanism to remove tri-(2-chloroisopropyl) phosphate (TCPP) under continuous flow operation. The removal rate (26%-28%) of TCPP in two types of CWs containing plants was twice as much as that in plant-free CWs in 6-month experiments, and TCPP showed a terminal accumulation phenomenon in Cyperus alternifolius with the order of accumulation of leaf>stem>root. The mass balance indicated that the contributions of filler and hydrophyte absorption to TCPP removal were less than 1%, but the transpiration of hydrophytes may make an important contribution (approximately 10%) to TCPP removal. Species in the genera Massilia, Denitratisoma and SM1A02 may be responsible for TCPP biodegradation. In addition, the effect of TCPP on the metabolic pathways and energy generation in the roots of C. alternifolius suggested that TCPP may be transported and utilized through cellular metabolism.
More Related Videos
Related Concept Videos
Bioremediation
Factors Affecting Solubility
The Phosphorus Cycle

