Related Experiment Video
Updated: Dec 10, 2025

Lab-Scale Model to Evaluate Odor and Gas Concentrations Emitted by Deep Bedded Pack Manure
Published on: July 19, 2018
When pits fill up: Supply and demand for safe pit-emptying services in Kisumu, Kenya
Rachel Peletz1, Clara MacLeod2, Joan Kones2
1The Aquaya Institute, San Anselmo, CA, United States of America.
Abstract:
Improving sanitation conditions in low-income communities is a major challenge for rapidly growing cities of the developing world. The expenses and logistical difficulties of extending sewerage infrastructure have focused increasing attention on the requirements for safe and cost-effective fecal sludge management services. These services, which are primarily provided by the private sector, include the collection and treatment of fecal waste from latrine pits and septic tanks. To determine the degree to which market forces can promote safe fecal sludge removal in low-income neighborhoods of Kisumu, Kenya, we compared household willingness-to-pay for formal pit emptying with the prices charged by service providers. Through surveys of 942 households and a real-money voucher trial with 646 households, we found that stated and revealed demand for formal emptying services were both low, with less than 20% of households willing to pay full market prices. Our results suggest that improving fecal sludge management in these neighborhoods via the private sector will require large subsides, ranging from 55.1-81.4 million KES (551,000-814,000 USD) annually, to address the gap between willingness-to-pay and market prices. Raising and administering subsidies of this scale will require the development of a city-wide sanitation master plan that includes investment, management, and regulatory procedures for fecal sludge management. In the absence of government investment and coordination, it is unlikely that the private sector will address safe sanitation needs in low-income areas of Kisumu.
Related Concept Videos
Survey Safety
Pumped Concrete
For direct-acting pumps, the concrete enters the pump via the inlet valve under the action of gravity and suction created by the movement of the piston. This concrete is then forced into the pipeline and out through the outlet valve by the forward movement...
The Availability Heuristic
Slump Test
Concrete is poured into the mold in three layers to conduct the test. Each layer is compacted 25 times with a steel tamping rod, which has a five-eighths-inch diameter and a rounded end, to ensure even distribution and eliminate...

