Critical risk determination method of energy-flow network for urban electricity system under extreme heat wave impact

Chunming Shen1, Wei Zhu2, Liping Xu2

  • 1Beijing Research Center of Urban System Engineering, Beijing, 100035, China; Beijing Academy of Science and Technology, Beijing, 100089, China.

Environmental Research
|September 4, 2020
PubMed

Related Concept Videos

Maximum Power Flow and Line Loadability01:23

Maximum Power Flow and Line Loadability

The maximum power flow for lossy transmission lines is derived using ABCD parameters in phasor form. These parameters create a matrix relationship between the sending-end and receiving-end voltages and currents, allowing the determination of the receiving-end current. This relationship facilitates calculating the complex power delivered to the receiving end, from which real and reactive power components are derived.
500
Fast Decoupled and DC Powerflow01:24

Fast Decoupled and DC Powerflow

The fast decoupled power flow method addresses contingencies in power system operations, such as generator outages or transmission line failures. This method provides quick power flow solutions, essential for real-time system adjustments. Fast decoupled power flow algorithms simplify the Jacobian matrix by neglecting certain elements, leading to two sets of decoupled equations:
625
The Power Flow Problem and Solution01:26

The Power Flow Problem and Solution

Power flow problem analysis is fundamental for determining real and reactive power flows in network components, such as transmission lines, transformers, and loads. The power system's single-line diagram provides data on the bus, transmission line, and transformer. Each bus k in the system is characterized by four key variables: voltage magnitude Vk​, phase angle δk​, real power Pk​, and reactive power Qk​. Two of these four variables are inputs, while the power flow program computes...
681
Power System Three-Phase Short Circuits01:21

Power System Three-Phase Short Circuits

Determining the subtransient fault current in a power system involves representing transformers by their leakage reactances, transmission lines by their equivalent series reactances, and synchronous machines as constant voltage sources behind their subtransient reactances. In this analysis, certain elements are excluded, such as winding resistances, series resistances, shunt admittances, delta-Y phase shifts, armature resistance, saturation, saliency, non-rotating impedance loads, and small...
432
Control of Power Flow01:30

Control of Power Flow

There are several methods to control power flow in power systems:
581
Bus Impedance Matrix01:24

Bus Impedance Matrix

Calculating subtransient fault currents for three-phase faults in an N-bus power system involves using the positive-sequence network. When a three-phase short circuit occurs at a specific bus, the analysis uses the superposition method to evaluate two separate circuits.
In the first circuit, all machine voltage sources are short-circuited, leaving only the prefault voltage source at the fault location. The positive-sequence bus impedance matrix can be determined by solving the nodal equations,...
413