Related Experiment Video
Updated: Dec 9, 2025

Eye Tracking During A Complex Aviation Task For Insights Into Information Processing
Published on: April 4, 2025
Evaluating process-based and crew- centred approaches to procedure design in aviation: workload and performance
Tim André Schmidt1, Houda Kerkoub Kourdali2, Jim Nixon1
1Centre for Safety and Accident Investigation, Cranfield University, College Rd, Cranfield, MK43 0AL, UK.
Abstract:
In this article, we compare and evaluate two methods of procedure design using an aircraft go-around (GA) as a test scenario. We contrast the manufacturer specified, crew-centric procedure with a redesigned process-centred perspective. We test the claim that the process-centred design can take into account situational factors more effectively and generate less workload. We report a heuristic assessment of the new procedure against design guidelines and an evaluation in a full-flight simulator at the German Aerospace Centre (DLR) using qualified airline pilots to assess workload and performance. Both the manufacturer specified and new procedure were employed in three GA scenarios representative of increasing operational complexity. Results demonstrate an advantage for the new procedure design in the most complex scenario. The new, process-based procedure can reduce reported crew workload and improve response flexibility in more complex scenarios, improving rated performance. This study suggests that the process-based account in procedure design has advantages when compared to the flight crew-centric approach. These advantages include enhanced flexibility, robustness and improved crew performance during GA.
Related Concept Videos
Design Consideration
The factor of safety is another key...
Methods of Documentation II: POMR
Assessment of apical radial pulse
The A-R pulse assessment involves simultaneous evaluation of the apical and radial pulses. When the apical and radial pulse rates vary, this assessment helps identify a pulse deficit.
Pre-Procedural Preparation
Pre-Procedural Guidelines for Assessing Blood Pressure
Factors Affecting Workability

