Uncertainty in Continuous Scatterplots, Continuous Parallel Coordinates, and Fibers
Related Experiment Video
Updated: Dec 6, 2025

07:58
Quantifying Fibrillar Collagen Organization with Curvelet Transform-Based Tools
Published on: November 11, 2020
6.5K
Abstract:
In this paper, we introduce uncertainty to continuous scatterplots and continuous parallel coordinates. We derive respective models, validate them with sampling-based brute-force schemes, and present acceleration strategies for their computation. At the same time, we show that our approach lends itself as well for introducing uncertainty into the definition of fibers in bivariate data. Finally, we demonstrate the properties and the utility of our approach using specifically designed synthetic cases and simulated data.
Related Concept Videos
Scatter Plot
10.5K
The most common and easiest way to display the relationship between two variables, x and y, is a scatter plot. A scatter plot shows the direction of a relationship between the variables. A clear direction happens when there is either:
10.5K
Residuals and Least-Squares Property
8.7K
The vertical distance between the actual value of y and the estimated value of y. In other words, it measures the vertical distance between the actual data point and the predicted point on the line
If the observed data point lies above the line, the residual is positive, and the line underestimates the actual data value for y. If the observed data point lies below the line, the residual is negative, and the line overestimates the actual data value for y.
The process of fitting the best-fit...
If the observed data point lies above the line, the residual is positive, and the line underestimates the actual data value for y. If the observed data point lies below the line, the residual is negative, and the line overestimates the actual data value for y.
The process of fitting the best-fit...
8.7K
Residual Plots
5.8K
A residual plot is a statistical representation of data used to analyze correlation and regression results. It helps verify the requirements for drawing specific conclusions about correlation and regression. To obtain the residual plot, first, the residual for each data value is calculated, which is simply the vertical distance between the observed and the predicted value obtained from the regression equation.
When the residual values are plotted against the variable x, it is called a residual...
When the residual values are plotted against the variable x, it is called a residual...
5.8K
Uncertainty: Overview
1.3K
In analytical chemistry, we often perform repetitive measurements to detect and minimize inaccuracies caused by both determinate and indeterminate errors. Despite the cares we take, the presence of random errors means that repeated measurements almost never have exactly the same magnitude. The collective difference between these measurements - observed values - and the estimated or expected value is called uncertainty. Uncertainty is conventionally written after the estimated or expected value.
1.3K

