Related Experiment Video
Updated: Dec 2, 2025

Using Human Differentially Expressed Gene Lists to Perform Downstream Pathway Enrichment Analysis and Target Prioritization
Published on: October 3, 2025
Determining the Clinical Value and Critical Pathway of GTPBP4 in Lung Adenocarcinoma Using a Bioinformatics Strategy:
Zhiqian Zhang1, Juan Wang2, Jiayan Mao3
1College of Medical Technology, Zhejiang Chinese Medical University, Hangzhou, Zhejiang 310053, China.
Abstract:
Lung cancer is the leading cause of cancer-related death worldwide, and the most common histologic subtype is lung adenocarcinoma (LUAD). Due to the significant mortality and morbidity rates among patients with LUAD, the identification of novel biomarkers to guide diagnosis, prognosis, and therapy is urgent. Guanosine triphosphate-binding protein 4 (GTPBP4) has been found to be associated with tumorigenesis in recent years, but the underlying molecular mechanism remains to be elucidated. In the present study, we demonstrate that GTPBP4 is significantly overexpressed in LUAD primary tumors. A total of 55 genes were identified as potential targets of GTPBP4. GO enrichment analysis identified the top 25 pathways among these target genes, among which, ribosome biogenesis was shown to be the most central. Each target gene demonstrated strong and complex interactions with other genes. Of the potential target genes, 12 abnormally expressed candidates were associated with survival probability and correlated with GTPBP4 expression. These findings suggest that GTPBP4 is associated with LUAD progression. Finally, we highlight the importance of the role of GTPBP4 in LUAD in vitro. GTPBP4 knockdown in LUAD cells inhibited proliferation and metastasis, promoted apoptosis, and enhanced sensitivity to TP. Overall, we conclude that GTPBP4 may be considered as a potential biomarker of LUAD.
More Related Videos
07:41Performing Data Mining And Integrative Analysis Of Biomarker in Breast Cancer Using Multiple Publicly Accessible Databases
Published on: May 17, 2019
13:24Integration of Wet and Dry Bench Processes Optimizes Targeted Next-generation Sequencing of Low-quality and Low-quantity Tumor Biopsies
Published on: April 11, 2016