An Innovative Approach to Surveying the Geometry of Visibility Triangles at Railway Level Crossings

Arkadiusz Kampczyk1

  • 1Department of Engineering Surveying and Civil Engineering, Faculty of Mining Surveying and Environmental Engineering, AGH University of Science and Technology, al. A. Mickiewicza 30, 30-059 Krakow, Poland.

Related Concept Videos

Profile Leveling and Cross Sections01:26

Profile Leveling and Cross Sections

Profile leveling and cross-sections are surveying methods used to determine and document terrain elevations for infrastructure projects such as highways, railroads, canals, and pipelines. These methods provide data for earthwork planning and alignment of proposed routes.  Profile leveling involves measuring elevations along a fixed line to create a vertical terrain profile. A surveyor sets up a leveling instrument at the benchmark (BM) and records a backsight (BS) to determine the...
1.2K
Design Example: Traverse Angle Computations01:25

Design Example: Traverse Angle Computations

Traverse angle computations are a critical component of surveying, used to compute the internal angles within a closed traverse. A traverse consists of a series of connected lines forming a closed loop, often used for land boundary delineation or mapping. Calculating the internal angles ensures accuracy in the traverse geometry and is essential for checking survey data integrity.The process begins with known azimuths and bearings of the traverse sides. Internal angles at each vertex are...
216
Adjusting a Traverse01:12

Adjusting a Traverse

In the site survey of a four-sided traverse, internal angles are essential to ensure geometric accuracy. The survey revealed that the sum of the measured internal angles was 359 degrees and 48 minutes, which is 12 minutes less than the expected 360 degrees. This discrepancy signals an error likely arising from measurement inaccuracies during the fieldwork.To rectify this error, the adjustment process involved distributing the 12-minute shortfall equally across the four internal angles. By...
245
Introduction to Vertical Curves01:24

Introduction to Vertical Curves

Vertical curves are parabolic transitions that connect different grades on highways and railroads, ensuring a smooth alignment between back and forward tangents. The back tangent represents the initial grade, while the forward tangent defines the subsequent grade. These curves can be symmetrical, with equal tangent lengths, or nonsymmetrical, with varying lengths. The key points defining a vertical curve include the Point of Vertical Intersection (P.V.I.), where the tangents meet; the Point of...
357
Design Example: Alignment of a Road Line Using GIS01:17

Design Example: Alignment of a Road Line Using GIS

The alignment of a road line using Geographic Information Systems (GIS) is a critical process in civil engineering, combining advanced technology with practical decision-making. This methodology begins with the collection of geospatial data, including information on land cover, geomorphology, drainage patterns, slope, and contour details. Such data is typically acquired through satellite imagery and GIS tools, offering a comprehensive understanding of the terrain.Once the data is gathered, it...
206
Design Example: Measuring Distance Between Two Points with Obstructions01:10

Design Example: Measuring Distance Between Two Points with Obstructions

When measuring distances in areas with physical obstructions, such as a lake in a field, surveyors must employ techniques to calculate accurate lengths without direct line measurements. One effective method is the offset technique, which allows for precise distance estimation over inaccessible stretches.In this scenario, a surveyor must measure a side of an area that crosses a lake. Since the measuring tape cannot span the lake, the surveyor begins by establishing a baseline that aligns with...