Burning behaviour of rainscreen façades
Related Experiment Video
Updated: Nov 27, 2025

Author Spotlight: Advancing Place-Based Biochar Production for Ecosystem Restoration and Soil Health
Published on: April 5, 2024
Nicola Jones1, Gabrielle Peck1, Sean T McKenna1
1Centre for Fire and Hazard Science, University of Central Lancashire, Preston, PR1 2HE, UK.
Abstract:
Four reduced-height (5 m) BS 8414-1 façade flammability tests were conducted, three having mineral-filled aluminium composite material (ACM-A2) with polyisocyanurate (PIR) and phenolic (PF) foam and stone wool (SW) insulation, the fourth having polyethylene-filled ACM (ACM-PE) with PIR insulation. Each façade was constructed from a commercial façade engineer's design, and built by practising façade installers. The ACM-PE/PIR façade burnt so ferociously it was extinguished after 13.5 min, for safety. The three ACM-A2 cladding panels lost their structural integrity, and melted away from the test wall, whereupon around 40% of both the combustible PIR and PF insulation burnt and contributed to the fire spread. This demonstrates why all façade products must be non-combustible, not just the outer panels. For the three ACM-A2 tests, while the temperature in front of the cavity was independent of the insulation, the temperatures within it varied greatly, depending on the insulation. The system using PF/A2 allowed fire to break through to the cavity first, as seen by a sharp increase in temperature after 17 min. For PIR/A2, the temperature increased sharply at 22 minutes, as the panel started to fall away from the wall. For SW/A2, no rapid temperature rise was observed.
Related Concept Videos
Masonry Curtain Walls
Thermal Insulation in Masonry Walls
External insulation can be applied using an Exterior Insulation and Finish System (EIFS), which involves affixing panels of plastic foam to the wall and covering them with a polymeric stucco reinforced with glass fiber mesh....
Cavity Drainage and Flashings in Masonry walls
Weep holes, strategically placed at the base of the cavity, are critical for draining accumulated water. These openings are created by leaving head...
Composite Masonry Walls
Efflorescence in Masonry
While initial efflorescence is common post-construction and can be cleaned with water and a brush, in certain instances, efflorescence can reappear and gradually diminish over time as salts are leached out...
Design Example: Sustainability in Concrete Building
There are multiple approaches to achieve sustainability in a commercial concrete building. For instance, construct a concrete parking area under the building, utilizing pervious concrete paver blocks in open areas to facilitate rainwater collection through an underground...