Related Experiment Video
Updated: Nov 26, 2025

Watershed Planning within a Quantitative Scenario Analysis Framework
Published on: July 24, 2016
Flood economic assessment of structural measure based on integrated flood risk management: A case study in Beijing
Hao Wang1, Jinjun Zhou1, Ying Tang2
1College of Architecture and Civil Engineering, Beijing University of Technology, 100124, China.
Abstract:
Flood disasters have appeared more frequently in recent years because of climate change and urbanization, and Integrated Flood Risk Management (IFRM) has emerged as an effective method to reduce damage from these floods. This research studies IFRM methods in three aspects: flood risk identification of high-risk areas, flood risk assessment to quantify economic losses, and flood risk management to identify structural measures with the greatest engineering benefits. These methods were applied to Beijing as a case study, and the results showed that the Zuoan-Road area was a high-risk area with economic losses ranging from 0.7 million to 35.9 million euros over different return periods. There are five structural measures in Zuoan-Road area, with engineering benefits ranging from 0.97 to 1.60 over different return periods, and the one with the greatest engineering benefits had a fifty-year return period. The results of this research can be used to support urban flood risk management in Beijing.
Related Concept Videos
Design Example: Analyzing Capacity Contours for Flood Risk Assessment
Applications of GIS: Disaster Management and Emergency Response
Design Example: Maintaining Level of an Embankment
Design Example: Creating a Hydraulic Model of a Dam Spillway
Responses to Drought and Flooding
Design Example: Alignment of a Road Line Using GIS

