Does the potential safety risk affect whether particular construction hazards are recognized or not?

Alex Albert1, Bhavana Pandit1, Yashwardhan Patil1

  • 1North Carolina State University, Department of Civil Construction and Environmental Engineering, 2501 Stinson Drive, Raleigh, NC 27607, United States.

Journal of Safety Research
|December 18, 2020
PubMed
Summary

Construction workers are more likely to recognize safety hazards with higher perceived risks. This finding is crucial for improving safety protocols and interventions in the construction industry.

Related Concept Videos

Survey Safety01:28

Survey Safety

Surveying near highways, rough terrain, or power lines involves significant risks. Working along highways is particularly dangerous and requires the use of warning signs and flagmen. It is safest to avoid working directly on roads and use offsets whenever possible. When highway work is unavoidable, it must follow all safety guidelines. Surveyors should wear bright clothing, such as orange reflective vests, to ensure visibility to motorists, coworkers, and hunters. In construction zones, wearing...
266
Design Consideration01:22

Design Consideration

Designing a structure involves a series of considerations, primarily the material's ultimate strength, calculated through tests that measure changes under increased force until the material reaches its breaking point or limit. The ultimate load, where the material breaks, is divided by its original cross-sectional area, resulting in the ultimate normal stress or strength. The ultimate shearing stress is another significant factor taken into account.
The factor of safety is another key...
424
Design Example: Analyzing Capacity Contours for Flood Risk Assessment01:17

Design Example: Analyzing Capacity Contours for Flood Risk Assessment

Flood risk assessment involves careful planning and analysis to ensure the safety of communities near water retention structures. Capacity contours are a vital tool in this process, as they illustrate the potential spread of water at specific levels in a given area. In the context of building a bund across a small valley, these contours play a critical role in evaluating the safety of nearby residential areas.In this example, the bund is intended to store stormwater in the valley. The engineers...
197
The Availability Heuristic01:08

The Availability Heuristic

A heuristic is a general problem-solving framework (Tversky & Kahneman, 1974). You can think of these as mental shortcuts that are used to solve problems. Different types of heuristics are used in different types of situations, and the impulse to use a heuristic occurs when one of five conditions is met (Pratkanis, 1989):
6.8K
Schemas01:42

Schemas

A schema is a mental construct consisting of a cluster or collection of related concepts (Bartlett, 1932). There are many different types of schemata, and they all have one thing in common: schemata are a method of organizing information that allows the brain to work more efficiently. When a schema is activated, the brain makes immediate assumptions about the person or object being observed.
12.2K
Hazard Rate01:11

Hazard Rate

The hazard rate, also known as the hazard function or failure rate, is a statistical measure used to describe the instantaneous rate at which an event occurs, given that the event has not yet happened. From a probabilistic perspective, it represents the likelihood that a subject will experience the event in a very small time interval, conditional on surviving up to the beginning of that interval. In terms of frequency, the hazard rate can be viewed as the ratio of the number of events to the...
273