Related Experiment Video
Updated: Nov 25, 2025

Mesocosm-Scale Constructed Wetland Design for Wastewater Treatment
Published on: May 2, 2025
Pilot-scale study of forward osmosis for treating desulfurization wastewater
Cong Ma1, Qianqian Li2, Chang Dai2
1State Key Laboratory of Separation Membranes and Membrane Processes, School of Environmental Science and Engineering, Tiangong University, Tianjin 300387, China E-mail: mashi7822@163.com; Tianjin Haiyuanhui Technology Co., Ltd, Tianjin 300457, China.
Abstract:
Forward osmosis (FO) treatment of desulfurization wastewater shows great potential in laboratory scale tests. To explore the adaptability of the forward osmosis system in the practical treatment of desulfurization wastewater, we carried out a pilot test on desulfurization wastewater treated by the traditional method under the conditions of adding soda ash (SA) and adding FO scale inhibitor (FOSI). The results showed that the FO system could concentrate desulfurization wastewater with an average TDS of 15,816-32,820 mg/L in the influent water to an average TDS of more than 120,000 mg/L, which was concentrated 3.8-7.8 times. The removal rates of Ca2+, Mg2+ and Cl- were more than 99% and the system could operate stably for a long time. Under the condition of adding SA and FOSI, the system recovery rate was 85.38% and 73.02%, respectively. The operating cost was 25 RMB/ton and 21.77 RMB/ton, respectively. The results showed that the application of forward osmosis in desulfurization wastewater treatment was technically feasible and economically effective.
Related Concept Videos
Osmosis and Osmotic Pressure of Solutions
Precipitation and Co-precipitation

