Research on the schemes formulation and optimization method of sponge reconstruction in a highway service area
Yu-Hua Peng1, Zhuang Li1, Yong-Shuai Ding1
1School of Highway, Chang'an University, Xi'an 710064, China
Abstract:
This study proposed a method for constructing a low impact development (LID) plan to improve the utilization rate of rainwater in a highway service area and solve the problem of waterlogging. Firstly, based on the theory of LID, taking the total runoff as the control goal, and combining it with the functional zoning of the highway service area and the characteristics of LID facilities, several LID schemes were proposed. Then, the evaluation system of the LID scheme in service area was established by the analytic hierarchy process (AHP). These preliminary construction schemes were compared from three aspects (runoff control efficiency, economic efficiency and social efficiency) to determine the best LID plan. Finally, taking the Pu'er tunnel service area as an example, the construction scheme of the sponge city service area was optimized.
Related Concept Videos
Design Example: Alignment of a Road Line Using GIS
Manipulation and Analysis
Design Example: Analyzing Capacity Contours for Flood Risk Assessment
Design Example: Design of an Irrigation Channel
Response Surface Methodology
The process of RSM involves several key steps:
Design Example: Maintaining Level of an Embankment