Related Experiment Video
Updated: Nov 22, 2025

Author Spotlight: Exploring Non-Motor Symptoms in Parkinson's Disease
Published on: September 22, 2023
Irritable bowel syndrome and Parkinson's disease risk: register-based studies
Bojing Liu1, Arvid Sjölander2, Nancy L Pedersen2,3
1Department of Medical Epidemiology and Biostatistics, Karolinska Institutet, Stockholm, Sweden. bojing.liu@ki.se.
Abstract:
To examine whether irritable bowel syndrome (IBS) was related to the future risk of Parkinson's disease (PD), we conducted a nested case-control study in the Swedish total population including 56,564 PD cases identified from the Swedish Patient Register and 30 controls per case individually matched by sex and year of birth. Odds ratios (ORs) with 95% confidence intervals (CIs) for having a prior diagnosis of IBS were estimated using conditional logistic regression. We furthermore conducted a cohort study using the Swedish Twin Registry following 3046 IBS patients identified by self-reported abdominal symptoms and 41,179 non-IBS individuals. Through Cox proportional hazard models, we estimated hazard ratios (HRs) and 95% CIs for PD risk. In the nested case-control study, 253 (0.4%) PD cases and 5204 (0.3%) controls had a previous IBS diagnosis. IBS diagnosis was associated with a 44% higher risk of PD (OR = 1.44, 95% CI 1.27-1.63). Temporal relationship analyses showed 53% and 38% increased risk of PD more than 5 and 10 years after IBS diagnosis, respectively. In the cohort analysis based on the Swedish Twin Registry, there was no statistically significantly increased risk of PD related to IBS (HR = 1.25, 95% CI = 0.87-1.81). Our results suggest a higher risk of PD diagnosis after IBS. These results provide additional evidence supporting the importance of the gut-brain axis in PD.
Related Concept Videos
Irritable Bowel Syndrome II: Clinical Features and Diagnostic Evaluation
Irritable Bowel Syndrome (IBS) is classified into subtypes based on the predominant bowel habits as determined by the Bristol Stool Form Scale (BSFS). The subtypes are:
Neural Regulation
Parkinson's Disease: Overview
Irritable Bowel Syndrome I: Introduction
IBS is a chronic condition that can persist over a long period or recur frequently.
The pathogenesis of IBS involves a complex interplay of the following factors:
Altered...
Chronic Bowel Disorders: Introduction
Irritable Bowel Syndrome (IBS) is a common disorder affecting the gastrointestinal tract. The distinctive feature is recurrent abdominal pain associated with altered bowel movements, manifesting as constipation, diarrhea, or fluctuating between both. The...
Parkinson's Disease: Treatment
Parkinson's Disease is primarily a result of the loss of dopaminergic neurons in the substantia nigra pars compacta. The cornerstone of...
