Hedgehog Signaling, a Critical Pathway Governing the Development and Progression of Hepatocellular Carcinoma

Jia Ding1, Hui-Yan Li2, Li Zhang2

  • 1Department of Gastroenterology, Shanghai Jing'an District Central Hospital, Fudan University, Shanghai 200040, China.

Cells
|January 14, 2021
PubMed

Related Concept Videos

Hedgehog Signaling Pathway02:33

Hedgehog Signaling Pathway

The Hedgehog gene (Hh) was first discovered due to its control of the growth of disorganized, hair-like bristles phenotype in Drosophila, much like hedgehog spines. Hh plays a crucial role in the development of organs and the maintenance of homeostasis in both invertebrates and vertebrates. However, while Drosophila has only one Hh protein, mammals have multiple functional Hedgehog proteins - Sonic (Shh), Desert (Dhh), and Indian Hedgehog (Ihh). All of these homologous proteins have adapted to...
8.7K
Notch Signaling Pathway03:14

Notch Signaling Pathway

The Notch signaling pathway is a major intracellular signaling pathway that is highly conserved over a broad spectrum of metazoan species. It stands unique from other intracellular signaling mechanisms in animals because notch protein itself acts as the receptor as well as the primary signaling molecule.
The Notch gene came into the limelight in 1914 after the discovery that its mutation in Drosophila melanogaster leads to a serrated (or "notched") wing margin phenotype. It was not...
5.4K
Interactions Between Signaling Pathways01:19

Interactions Between Signaling Pathways

Signaling cascades usually lack linearity. Multiple pathways interact and regulate one another, allowing cells to integrate and respond to diverse environmental stimuli.
Convergence and divergence, and cross-talk between signaling pathways
Two distinct signaling pathways can converge on a single functional unit, which may either be a single protein or a complex of proteins. The response is either functionally distinct or synergistic between the two pathways but different from the response...
6.9K
Role Of Notch Signalling In Intestinal Stem Cell Renewal01:12

Role Of Notch Signalling In Intestinal Stem Cell Renewal

Notch signaling was first discovered in Drosophila melanogaster, where it is involved in cell lineage differentiation. Notch signaling regulates the maintenance and differentiation of intestinal stem cells or ISCs by controlling the expression of atonal homolog 1 or Atoh1. Atoh1 directs cells to differentiate into secretory cells.
Direct cell-to-cell contact is needed for the activation of Notch signaling. The signal is initiated when a notch ligand binds to a receptor on an adjacent cell, also...
2.3K
mTOR Signaling and Cancer Progression03:03

mTOR Signaling and Cancer Progression

The mammalian target of rapamycin or mTOR protein was discovered in 1994 due to its direct interaction with rapamycin. The protein gets its name from a yeast homolog called TOR. The mTOR protein complex in mammalian cells plays a major role in balancing anabolic processes such as the synthesis of proteins, lipids, and nucleotides and catabolic processes, such as autophagy in response to environmental cues, such as availability of nutrients and growth factors.
The mTOR pathway or the...
4.1K
Canonical Wnt Signaling Pathway02:54

Canonical Wnt Signaling Pathway

The gene encoding the main signaling molecules of the Wnt signaling pathways (the Wnt proteins) was discovered almost four decades ago by Nüsslein-Volhard and Wieschaus. They identified and originally named the gene "wingless" (wg) after a phenotype discovered during their landmark genetic screen in Drosophila for body pattern defects. At around the same time, another researcher named Harold Varmus found that a murine tumor virus activates the mammalian wg homolog, Int-1, which...
9.7K