Related Experiment Video
Updated: Nov 16, 2025

Parameterizing V-notch Weir Equations for Flow Monitoring in a Drainage Control Structure
Published on: April 25, 2025
Implications of model uncertainty for investment decisions to manage intermittent sewer overflows
Ambuj Kumar Sriwastava1, J A Torres-Matallana2, Alma Schellart3
1Department of Automatic Control and Systems Engineering, University of Sheffield, Portobello Street, S1 3JD Sheffield, United Kingdom.
Abstract:
Uncertainty in urban drainage modelling studies presents challenges to decision makers with limited investment resources attempting to achieve regulatory compliance for intermittent discharges from Combined Sewer Overflows. This paper presents the development of a new decision-making approach to address two key challenges encountered when attempting to manage sewer overflows, these are (i) the implications of different risk preferences of individuals for investment decisions; and (ii) how to utilize information on uncertainties in system performance predictions due to input or parameter uncertainty while comparing decision alternatives. The developed decision-making approach uses a multi-objective decision formulation to analyse the trade-off between investment and predicted system performance under uncertainty while accounting for risk preferences of the individual decision maker. The proposed uncertainty based decision-making approach is able to incorporate any threshold-based regulatory criteria for intermittent sewer overflows and is illustrated using a case study catchment in Luxembourg. The results from this case study highlight the significant impact of individuals' risk preferences on the level of investment recommended to comply with threshold-based regulatory criteria. It was demonstrated that differing levels of risk-averseness can result in a substantial increase in investment cost for solutions that are regulatory compliant. This paper demonstrates the need for water companies to rigorously define a corporate risk preference strategy to ensure consistent investment decisions across their operations; otherwise, individual preferences may cause significant over-investment to meet the same regulatory goals.
More Related Videos
Related Concept Videos
Design Example: Creating a Hydraulic Model of a Dam Spillway
Typical Model Studies
Design Example: Analyzing Capacity Contours for Flood Risk Assessment
Conservation of Mass in Moving, Nondeforming Control Volume
In the context of a detention basin, the conservation of mass states that the total mass of water entering the basin must equal the mass leaving the basin plus any accumulation of...
Underflow Gates
Modeling and Similitude

