Related Experiment Video
Updated: Nov 15, 2025

14:56
Remote Laboratory Management: Respiratory Virus Diagnostics
Published on: April 6, 2019
33.3K
Bench Building during COVID-19: Creating Capabilities and Training Teams.
Medical Journal (Fort Sam Houston, Tex.)
|March 5, 2021
Summary
A hospital rapidly created an Intensive Care Unit (ICU) and Corona Virus Unit (CVU) and trained 34 nurses in critical care for COVID-19 patients. This program ensured operational readiness during the pandemic surge and continues with refresher training.
Area of Science:
- Healthcare Management
- Nursing Education
- Infectious Disease Preparedness
Background:
- A 12-bed community hospital, Keller Army Community Hospital, prepared for a surge in critically ill patients during the COVID-19 pandemic.
- The hospital lacked Intensive Care Unit (ICU) beds and mobilized resources to establish a negative pressure Corona Virus Unit (CVU) with seven ICU and two step-down beds.
- A plan was developed to expand total bed capacity from 12 to 45 beds within 24 hours.
Purpose of the Study:
- To establish an ICU within a CVU.
- To implement a three-day curriculum for training mixed teams of critical care and non-critical care nurses.
- To prepare staff to manage critically ill patients with COVID-19.
Main Methods:
- A critical care curriculum was developed by nursing leaders and education staff, incorporating didactic materials and hands-on training for 34 nurses.
- Nurses with varied experience levels, from licensed practical nurses to advanced practice nurses, participated in cross-leveling training.
- Training covered essential critical care skills including PPE use, mechanical ventilation, catheter management, hemodynamics, and pharmacotherapy, with skills stations for practical application.
Main Results:
- A fully functional ICU and CVU was established within seven days, with 34 nurses completing the training.
- The didactic component had a 94.65% completion rate, and 100% of nurses completed hands-on skills training.
- The program ensured operational readiness during the surge, with ongoing monthly refresher training to maintain competencies.
Conclusions:
- The training program continues to develop new staff and adapt to evidence-based guideline changes.
- Training has evolved to include normal inpatient operations alongside COVID-19 patient care.
- Refresher courses for COVID-19 patient care are ongoing in anticipation of future surges.
Related Concept Videos
Workability of Concrete
239
The workability of concrete is a crucial property that affects its handling, placing, and finishing during construction. It describes the ease with which concrete can be mixed, placed, compacted, and finished. Workability is primarily concerned with the concrete's movement and its ability to resist internal friction and external resistance from molds and reinforcements during the application process.
Concrete's workability is determined by its resistance to internal forces that arise...
Concrete's workability is determined by its resistance to internal forces that arise...
239
Design Example: Managing Concrete Workability
175
This example deals with managing the workability of concrete for a raft foundation project under hot weather conditions. Workability is crucial for ensuring the concrete is easy to place, compact, and finish. In this scenario, a slump test — a common method to measure the workability of fresh concrete — initially indicated low workability. This was attributed to the rapid water loss from the concrete mix, exacerbated by the high temperatures causing the course aggregates to heat up.
175
Brick Cutting Techniques
367
Brick-cutting techniques involve various tools and methods to shape bricks for construction. A mason's hammer with a chisel-pointed end is used for basic shaping through sharp, precise strikes. For more complex shapes requiring higher precision, a power saw with a water-cooled diamond blade is used.
Cut bricks are categorized by size. Bricks cut to half their original length are called half-bats, while those cut to three-fourths their length are known as three-fourth bats.
Special types of...
Cut bricks are categorized by size. Bricks cut to half their original length are called half-bats, while those cut to three-fourths their length are known as three-fourth bats.
Special types of...
367
Design Example: Sustainability in Concrete Building
287
As the construction industry moves towards more eco-friendly practices, concrete's adaptability and its ability to incorporate sustainable features make it a key material in the drive towards greener building solutions.
There are multiple approaches to achieve sustainability in a commercial concrete building. For instance, construct a concrete parking area under the building, utilizing pervious concrete paver blocks in open areas to facilitate rainwater collection through an underground...
There are multiple approaches to achieve sustainability in a commercial concrete building. For instance, construct a concrete parking area under the building, utilizing pervious concrete paver blocks in open areas to facilitate rainwater collection through an underground...
287
Manufacture of Concrete Masonry Units
265
The process of manufacturing concrete masonry units begins by mixing stiff concrete composed of Portland cement, aggregates, and water. This mixture is then poured into metal molds. To ensure the concrete settles uniformly and to avoid separation of its components, the mixture in the molds is subjected to vibration. Shortly after, the still-wet blocks are removed from the molds and placed on racks.
These wet blocks are then transported for curing, which can occur in one of two environments: a...
These wet blocks are then transported for curing, which can occur in one of two environments: a...
265
Steel Fastening Techniques
524
Steel sections can be joined together through various fastening techniques including riveting, bolting, and welding, each suitable for different structural requirements and conditions.
Rivets are cylindrical steel fasteners with a specially designed head. During application, rivets are heated until white-hot and then inserted through pre-drilled holes in the steel sections. A pneumatic hammer is used to shape the exposed end into a second head, securing the sections together.
Bolting is another...
Rivets are cylindrical steel fasteners with a specially designed head. During application, rivets are heated until white-hot and then inserted through pre-drilled holes in the steel sections. A pneumatic hammer is used to shape the exposed end into a second head, securing the sections together.
Bolting is another...
524

