Hippocampal astrocytic neogenin regulating glutamate uptake, a critical pathway for preventing epileptic response

Dong Sun1, Zhi-Bing Tan1, Xiang-Dong Sun2

  • 1Department of Neurosciences, School of Medicine, Case Western Reserve University, Cleveland, OH 44106.

Related Concept Videos

Antiepileptic Drugs: Glutamate Antagonists01:14

Antiepileptic Drugs: Glutamate Antagonists

Glutamate is a fundamental neurotransmitter in the central nervous system, playing a vital role in neuronal communication and various cognitive processes. Glutamate stands as the principal excitatory neurotransmitter in the brain. Its presence is crucial for the communication between neurons, underpinning essential processes such as synaptic transmission, neuronal excitability, and plasticity. These functions are vital for higher-order cognitive processes, including learning and memory. The...
652
Antiepileptic Drugs: GABAergic Pathway Potentiators01:18

Antiepileptic Drugs: GABAergic Pathway Potentiators

γ-aminobutyric acid or GABA, plays a pivotal role as an inhibitory neurotransmitter in the brain. GABA pathway potentiators, also known as GABAergic drugs, are a class of pharmaceutical agents designed to enhance the functioning of the GABAergic system. These medications primarily treat epilepsy, a neurological disorder characterized by recurrent seizures.
The key GABA pathway potentiators used in epilepsy management are as follows.
Benzodiazepines are a well-known class of drugs used for...
901
Ligand-Gated Ion Channel Receptor: Gating Mechanism01:30

Ligand-Gated Ion Channel Receptor: Gating Mechanism

Ligand-gated ion channels are transmembrane proteins that play a vital role in intercellular communication and functions of the nervous system. They allow the influx of ions across the membrane once the neurotransmitter binds, allowing the subsequent transmission of electrical excitation across the neurons. Other ligand-gated ion channels, like the γ-aminobutyric acid (GABA) receptor, permit anions like chloride into the cells on the binding of the GABA molecule. Their entry into the cell...
3.2K