Short reaction times coupled with alkalization improves the release of phosphorus from Al-waste activated sludge
Wang Yan1, Jiayi Wu1, Yun Chen2
1School of Environment, Nanjing Normal University, Nanjing, Jiangsu 210023, People's Republic of China; Jiangsu Engineering Lab of Water and Soil Eco-remediation, Nanjing Normal University, Nanjing, Jiangsu 210023, People's Republic of China.
Abstract:
In this study, the performance and mechanism of P release from Al-waste activated sludge (WAS) via wet-chemical treatment at different reaction times were investigated. The maximum P release (46% of TP) was achieved at 20 min when the pH was maintained at 2 during acidic treatment. During alkali treatment, the maximum P concentration (363.96 mg/L, 46.07%) was achieved at 10 min when pH was initially adjusted to 12. Acidic treatment took twice as long to achieve the same efficiency of released P as the alkali treatment. Furthermore, P release mainly originated from Al-P and Ca-P during acidic treatment and Al-P dissolution during alkali treatment. The cost of chemical consumption was 483.96 USD/ton TS sludge with acidic treatment, which was 8.49 times higher than that of alkali treatment without pH control. Thus, short reaction times (ca. 10 min) coupled with alkalization provide an effective approach for improving P release from Al-WAS.
More Related Videos
08:21Optimized Procedure for Determining the Adsorption of Phosphonates onto Granular Ferric Hydroxide using a Miniaturized Phosphorus Determination Method
Published on: May 18, 2018
06:35Implementation of a Hyperbolic Vortex Plasma Reactor for the Removal of Micropollutants in Water
Published on: July 25, 2025