Analysis on the hidden cost of prefabricated buildings based on FISM-BN
Junlong Peng1, Jing Zhou1, Fanyi Meng1
1College of Transportation Engineering, Changsha University of Science and Technology, Changsha, Hunan, China.
Abstract:
Facing the pressure of environment, sustainable development is the demand of the current construction industry development. Prefabricated construction technologies has been actively promoted in China. Cost has always been one of the important factors in the development of prefabricated buildings. The hidden cost of prefabricated buildings has a great impact on the total cost of the project, and it exists in the whole process of building construction. In this paper innovatively studies the cost of prefabricated buildings from the perspective of hidden cost. In order to analysis the hidden cost of prefabricated buildings, the influencing factor index system in terms of design, management, technology, policy and environment has been established, which includes 13 factors in total. And the hidden cost analysis model has been proposed based on FISM-BN, this model combines fuzzy interpretive structure model(FISM) with Bayesian network(BN). This model can comprehensively analyze the hidden cost through the combination of qualitative and quantitative methods. And the analysis process is dynamic, not fixed at a certain point in time to analyze the cost. We can get the internal logical relationship among the influencing factors of the hidden cost, and present it in the form of intuitive chart by FISM-BN. Furthermore the model could not only predict the probability of the hidden cost of prefabricated buildings and realize in-time control through causal reasoning, but also predict the posterior probability of other influencing factors through diagnostic reasoning when the hidden cost occurs and find out the key factors that lead to the hidden cost. Then the final influencing factors are determined after one by one check. Finally, the model is demonstrated on the hidden cost analysis of prefabricated buildings the probability of recessive cost is 26%. In the analysis and control of the hidden cost of prefabricated buildings, scientific and effective decision-making and reference opinions are provided for managers.
More Related Videos
Related Concept Videos
Design Example: Sustainability in Concrete Building
There are multiple approaches to achieve sustainability in a commercial concrete building. For instance, construct a concrete parking area under the building, utilizing pervious concrete paver blocks in open areas to facilitate rainwater collection through an underground...
Posttensioned Masonry Walls
Post-tensioned masonry walls use high-strength steel rods or flexible tendons to enhance the strength and efficiency of masonry structures. These elements are securely anchored to the foundation and extend vertically either within the cores of the masonry units or between the masonry wythes. The construction process involves building the wall with these tensioning elements in place and allowing the mortar to fully cure.
Following the curing process, the tensioning begins. Steel rods are...
Masonry Loadbearing Walls
Internal Loadings in Structural Members: Problem Solving
To illustrate this, let's consider a beam OC of 5 kN, inclined at an angle of 53.13° with the horizontal and supported at both ends. Determine the internal...
Indeterminate Structure
Prismatic Beams: Problem Solving
The design begins with analyzing the beam as a free body to identify moments and force balances, thereby determining support reactions. Next, the...