Method for Tunnel Displacements Calculation Based on Mobile Tunnel Monitoring System

Zeyu Yue1, Haili Sun1, Ruofei Zhong1

  • 1Beijing Advanced Innovation Center for Imaging Theory and Technology, Key Laboratory of 3D Information Acquisition and Application, Ministry of Education, College of Resource Environment and Tourism, Academy for Multidisciplinary Studies, Capital Normal University, Beijing 100048, China.

Related Concept Videos

Design Example: Identifying the Locations of Monuments in the Field Using Global Positioning System Device01:30

Design Example: Identifying the Locations of Monuments in the Field Using Global Positioning System Device

Surveyors use Global Positioning System (GPS) technology to measure the precise location and elevation of points on Earth. In a recent survey, GPS receivers were used to determine the coordinates and elevations of two park monuments. The process involved careful mission planning, data collection, and correction to ensure accuracy. The survey began with mission planning to identify optimal satellite visibility and minimize Position Dilution of Precision (PDOP). A geodetic control point...
214
Distance Corrections01:15

Distance Corrections

To achieve precise distance measurements, especially in surveying and construction, certain corrections must be applied to account for potential sources of error like the standardization errors, temperature variations, and slope adjustments.Standardization error emerges when measurement equipment undergoes changes, such as wear, repairs, or weather impacts. To address this, surveyors compare the equipment’s readings to a standard. This process identifies any deviation that might lead to...
131
Design Example: Measuring Distance Between Two Points with Obstructions01:10

Design Example: Measuring Distance Between Two Points with Obstructions

When measuring distances in areas with physical obstructions, such as a lake in a field, surveyors must employ techniques to calculate accurate lengths without direct line measurements. One effective method is the offset technique, which allows for precise distance estimation over inaccessible stretches.In this scenario, a surveyor must measure a side of an area that crosses a lake. Since the measuring tape cannot span the lake, the surveyor begins by establishing a baseline that aligns with...
192
Design Example: Maintaining Level of an Embankment01:19

Design Example: Maintaining Level of an Embankment

Constructing a roadway embankment over uneven terrain requires precise leveling to ensure stability and proper drainage. Surveyors use a leveling instrument and staff to calculate ground elevations and determine the required fill material at each point along the embankment alignment.The process begins by positioning a leveling instrument near a benchmark with a known elevation. A backsight reading establishes the instrument height, which serves as a reference for subsequent measurements. A...
218
Beams with Unsymmetric Loadings01:17

Beams with Unsymmetric Loadings

Analyzing a supported beam under unsymmetrical loadings is essential in structural engineering to understand how beams respond to varied force distributions. This analysis involves calculating the deflection and identifying points where the slope of the beam is zero, which are crucial for ensuring structural stability and functionality.
The first moment-area theorem determines the slope at any point on the beam. This theorem indicates that the change in slope between two points on a beam...
221
Adjusting a Traverse01:12

Adjusting a Traverse

In the site survey of a four-sided traverse, internal angles are essential to ensure geometric accuracy. The survey revealed that the sum of the measured internal angles was 359 degrees and 48 minutes, which is 12 minutes less than the expected 360 degrees. This discrepancy signals an error likely arising from measurement inaccuracies during the fieldwork.To rectify this error, the adjustment process involved distributing the 12-minute shortfall equally across the four internal angles. By...
198