Investigating factors affecting bus/minibus accident severity in a developing country for different subgroup datasets

Reuben Tamakloe1, Sungho Lim1, Enoch F Sam2

  • 1Department of Transportation Engineering, University of Seoul, 163 Seoulsiripdae-ro Dongdaemun-gu, Seoul 02504, South Korea.

Related Concept Videos

Friction: Problem Solving01:21

Friction: Problem Solving

Friction is an essential force that influences the motion of objects in daily life. Depending on the situation, it can be either beneficial or problematic. Consider a bus with a mass of three megagrams and its center of mass at a specific point, moving along a banked road at a constant speed. The coefficient of static friction between the tires and the road is 0.5. Find the maximum angle of the banked road at which the bus would not slip or tip.
Initially, a visual representation of the...
315
Sight Distance in a Vertical Curve01:29

Sight Distance in a Vertical Curve

Sight distance on vertical curves is critical in roadway design. It ensures drivers can see far enough ahead to identify and respond to hazards effectively. This directly impacts safety, driver comfort, and the overall efficiency of the transportation network.Vertical curves are classified into crest and sag curves based on their geometry. For crest curves, sight distance is determined by the line of sight between a driver's eye and a small object on the road's surface. Design parameters for...
172
Survey Safety01:28

Survey Safety

Surveying near highways, rough terrain, or power lines involves significant risks. Working along highways is particularly dangerous and requires the use of warning signs and flagmen. It is safest to avoid working directly on roads and use offsets whenever possible. When highway work is unavoidable, it must follow all safety guidelines. Surveyors should wear bright clothing, such as orange reflective vests, to ensure visibility to motorists, coworkers, and hunters. In construction zones, wearing...
235
Bus Impedance Matrix01:24

Bus Impedance Matrix

Calculating subtransient fault currents for three-phase faults in an N-bus power system involves using the positive-sequence network. When a three-phase short circuit occurs at a specific bus, the analysis uses the superposition method to evaluate two separate circuits.
In the first circuit, all machine voltage sources are short-circuited, leaving only the prefault voltage source at the fault location. The positive-sequence bus impedance matrix can be determined by solving the nodal equations,...
214
Factors Affecting Creep01:28

Factors Affecting Creep

In normal-weight aggregate concrete, the hardened cement paste is the primary contributor to creep, whereas the aggregates, being stiffer than the cement paste, are more resilient to stress-induced deformation. The stiffness of the aggregates is defined by their modulus of elasticity, and the more voluminous they are in the concrete, the less it will creep.
Further, the water/cement ratio is critical, as a lower ratio increases concrete strength, thus reducing creep. The strength of the...
245
Factors Affecting Workability01:24

Factors Affecting Workability

The workability of concrete is a critical characteristic that influences the ease of mixing, handling, and finishing the concrete. It is affected by several factors including water content, aggregate properties, and admixtures like air entrainment. Water plays a fundamental role as it lubricates the concrete mix, facilitating easier movement and placement. However, the water requirement varies depending on the texture and shape of aggregates. Finer particles and angular, rough-textured...
163