Single-Camera-Based Bridge Structural Displacement Measurement with Traffic Counting

Zulhaj Aliansyah1, Kohei Shimasaki2, Taku Senoo3

  • 1Graduate School of Engineering, Hiroshima University, 1-4-1 Kagamiyama, Higashi-hiroshima, Hiroshima 739-8527, Japan.

Related Concept Videos

Distance Measurements by Taping01:18

Distance Measurements by Taping

Tapes are essential in surveying for accurate, durable, and short-distance measurements. Made from lightweight, nylon-coated steel, they offer flexibility and strength for rugged outdoor use. The nylon coating protects against rust and wear, extending the tape's life. Standard lengths, around 30 meters, are marked in meters and millimeters for precision.Surveyors select tapes based on site conditions and accuracy needs. Lightweight, nylon-coated tapes are commonly used for ease of handling and...
173
Design Example: Strain Gauge Bridge or Wheatstone Bridge01:15

Design Example: Strain Gauge Bridge or Wheatstone Bridge

The utilization of strain gauges as transducers for converting mechanical strain into electrical signals is a common practice in various engineering applications. These strain gauges are frequently integrated into Wheatstone bridge circuits to accurately measure parameters such as force or pressure. Within this context, each element within the circuit exhibits a resistance that undergoes subtle variations when subjected to mechanical strain. The primary objective is to convert minuscule...
661
Design Example: Measuring Distance Between Two Points with Obstructions01:10

Design Example: Measuring Distance Between Two Points with Obstructions

When measuring distances in areas with physical obstructions, such as a lake in a field, surveyors must employ techniques to calculate accurate lengths without direct line measurements. One effective method is the offset technique, which allows for precise distance estimation over inaccessible stretches.In this scenario, a surveyor must measure a side of an area that crosses a lake. Since the measuring tape cannot span the lake, the surveyor begins by establishing a baseline that aligns with...
176