Vicario's illusion of sloping steps reexamined

P Bressan1

  • 1Dipartimento di Psicologia Generale, Università di Padova, Italy.

Perception
|January 1, 1987
PubMed

Related Concept Videos

Schemas01:42

Schemas

A schema is a mental construct consisting of a cluster or collection of related concepts (Bartlett, 1932). There are many different types of schemata, and they all have one thing in common: schemata are a method of organizing information that allows the brain to work more efficiently. When a schema is activated, the brain makes immediate assumptions about the person or object being observed.
Work Done Over an Inclined Plane01:11

Work Done Over an Inclined Plane

The center-of-mass framework helps to easily describe the work done on rigid bodies. Since the internal forces in a rigid body do no work, they can be ignored, and the external forces can be considered in the work-energy theorem.
The work done by gravity to move a rigid body, or the work done by an opposing force to move a rigid body against gravity, can be calculated using the center-of-mass framework. It is the line integral of the force of gravity over the path, considered positive if...
Influence of Earth's Curvature and Atmospheric Refraction on Leveling01:26

Influence of Earth's Curvature and Atmospheric Refraction on Leveling

During leveling, the Earth's curvature and atmospheric refraction introduce deviations in the line of sight from a true horizontal reference. When the line of sight is leveled, it remains perpendicular to the plumb line only at a single point. Beyond this, it deviates due to the Earth’s curvature, represented by the correction C. For a sight distance D, the deviation can be derived using the relationship:This relationship shows that the deviation increases quadratically with distance. Over a...
Design Example: Maintaining Level of an Embankment01:19

Design Example: Maintaining Level of an Embankment

Constructing a roadway embankment over uneven terrain requires precise leveling to ensure stability and proper drainage. Surveyors use a leveling instrument and staff to calculate ground elevations and determine the required fill material at each point along the embankment alignment.The process begins by positioning a leveling instrument near a benchmark with a known elevation. A backsight reading establishes the instrument height, which serves as a reference for subsequent measurements. A...
Elevation of Intermediate Points on Vertical Curves01:20

Elevation of Intermediate Points on Vertical Curves

Vertical curves are essential in roadway design because they provide smooth transitions between varying roadway grades. Designing vertical curves involves calculating intermediate elevations and identifying the curve's highest or lowest point, which is essential for optimal roadway performance.Intermediate elevations on a vertical curve are determined using the tangent offset method. This method considers the initial elevation at the start of the curve, the grades, and the curve's geometry. The...
Sight Distance in a Vertical Curve01:29

Sight Distance in a Vertical Curve

Sight distance on vertical curves is critical in roadway design. It ensures drivers can see far enough ahead to identify and respond to hazards effectively. This directly impacts safety, driver comfort, and the overall efficiency of the transportation network.Vertical curves are classified into crest and sag curves based on their geometry. For crest curves, sight distance is determined by the line of sight between a driver's eye and a small object on the road's surface. Design parameters for...