Uncertainty analysis of model inputs in riverine water temperature simulations

Babak Abdi1, Omid Bozorg-Haddad2, Xuefeng Chu3

  • 1Department of Irrigation and Reclamation Engineering, Faculty of Agricultural Engineering and Technology, College of Agriculture and Natural Resources, University of Tehran, Karaj, Tehran, Iran.

Scientific Reports
|October 8, 2021
PubMed

Related Concept Videos

Typical Model Studies01:30

Typical Model Studies

Fluid mechanics model studies often utilize scaled-down systems to predict fluid behavior in full-scale environments, such as river flows, dam spillways, and structures interacting with open surfaces. Maintaining Froude number similarity in river models is crucial, as it replicates surface flow features like wave patterns and velocities.
487
Propagation of Uncertainty from Random Error00:59

Propagation of Uncertainty from Random Error

An experiment often consists of more than a single step. In this case, measurements at each step give rise to uncertainty. Because the measurements occur in successive steps, the uncertainty in one step necessarily contributes to that in the subsequent step. As we perform statistical analysis on these types of experiments, we must learn to account for the propagation of uncertainty from one step to the next. The propagation of uncertainty depends on the type of arithmetic operation performed on...
1.3K
Rapidly Varying Flow01:24

Rapidly Varying Flow

Rapidly varying flow (RVF) in open channels is characterized by abrupt changes in flow depth over a short distance, with the rate of depth change relative to distance often approaching unity. These flows are inherently complex due to their transient and multi-dimensional nature, making exact analysis difficult. However, approximate solutions using simplified models provide valuable insights into their behavior.Key Features of Rapidly Varying FlowRVF is commonly observed in scenarios involving...
173
Uncertainty: Overview00:59

Uncertainty: Overview

In analytical chemistry, we often perform repetitive measurements to detect and minimize inaccuracies caused by both determinate and indeterminate errors. Despite the cares we take, the presence of random errors means that repeated measurements almost never have exactly the same magnitude. The collective difference between these measurements - observed values - and the estimated or expected value is called uncertainty. Uncertainty is conventionally written after the estimated or expected value.
1.2K
Random Error01:04

Random Error

Random or indeterminate errors originate from various uncontrollable variables, such as variations in environmental conditions, instrument imperfections, or the inherent variability of the phenomena being measured. Usually, these errors cannot be predicted, estimated, or characterized because their direction and magnitude often vary in magnitude and direction even during consecutive measurements. As a result, they are difficult to eliminate. However, the aggregate effect of these errors can be...
3.9K
Design Example: Analyzing Capacity Contours for Flood Risk Assessment01:17

Design Example: Analyzing Capacity Contours for Flood Risk Assessment

Flood risk assessment involves careful planning and analysis to ensure the safety of communities near water retention structures. Capacity contours are a vital tool in this process, as they illustrate the potential spread of water at specific levels in a given area. In the context of building a bund across a small valley, these contours play a critical role in evaluating the safety of nearby residential areas.In this example, the bund is intended to store stormwater in the valley. The engineers...
153