Baseline-dependent clock offsets in VLBI data analysis

Hana Krásná1,2, Frédéric Jaron1, Jakob Gruber1

  • 1Department of Geodesy and Geoinformation, Technische Universität Wien (TU Wien), Wiedner Hauptstraße 8-10, 1040 Vienna, Austria.

Journal of Geodesy
|November 18, 2021
PubMed

Related Concept Videos

Biological Clocks and Seasonal Responses02:45

Biological Clocks and Seasonal Responses

The circadian—or biological—clock is an intrinsic, timekeeping, molecular mechanism that allows plants to coordinate physiological activities over 24-hour cycles called circadian rhythms. Photoperiodism is a collective term for the biological responses of plants to variations in the relative lengths of dark and light periods. The period of light-exposure is called the photoperiod.
39.6K
Common Leveling Mistakes and Errors01:17

Common Leveling Mistakes and Errors

A survey team is tasked with determining the elevation difference between points Point A and Point B, separated by uneven terrain. They use a leveling instrument and a leveling rod.Common MistakesMisreading the Rod: During a backsight reading at Point A, the instrumentman observes the rod partially obscured by tall grass. Instead of reading 1.135 m, they mistakenly record 1.735 m due to the misalignment of the crosshair with the wrong graduation. This error adds 0.600 m to all subsequent...
160
Atomic Nuclei: Larmor Precession Frequency01:11

Atomic Nuclei: Larmor Precession Frequency

The earth's gravitational field produces a 'twisting force' perpendicular to the angular momentum of a spinning mass (such as a spinning top) that causes the mass to 'wobble' around the gravitational field axis in a phenomenon called precession. Similarly, the magnetic moment (μ) of a spinning nucleus precesses due to an external magnetic field directed along the z-axis. The precession of the magnetic moment vector about the magnetic field is called Larmor precession,...
1.9K
Adjusting a Traverse01:12

Adjusting a Traverse

In the site survey of a four-sided traverse, internal angles are essential to ensure geometric accuracy. The survey revealed that the sum of the measured internal angles was 359 degrees and 48 minutes, which is 12 minutes less than the expected 360 degrees. This discrepancy signals an error likely arising from measurement inaccuracies during the fieldwork.To rectify this error, the adjustment process involved distributing the 12-minute shortfall equally across the four internal angles. By...
151
Distance Corrections01:15

Distance Corrections

To achieve precise distance measurements, especially in surveying and construction, certain corrections must be applied to account for potential sources of error like the standardization errors, temperature variations, and slope adjustments.Standardization error emerges when measurement equipment undergoes changes, such as wear, repairs, or weather impacts. To address this, surveyors compare the equipment’s readings to a standard. This process identifies any deviation that might lead to...
112
Distance Measurements by Taping01:18

Distance Measurements by Taping

Tapes are essential in surveying for accurate, durable, and short-distance measurements. Made from lightweight, nylon-coated steel, they offer flexibility and strength for rugged outdoor use. The nylon coating protects against rust and wear, extending the tape's life. Standard lengths, around 30 meters, are marked in meters and millimeters for precision.Surveyors select tapes based on site conditions and accuracy needs. Lightweight, nylon-coated tapes are commonly used for ease of handling and...
148