The Challenges of Equestrian Arena Surfaces: The Unprecedented Use of a Raised Platform at the 2012 Olympic Games

Alison J Northrop1, Jaime H Martin1, Michael L Peterson2

  • 1School of Animal Rural and Environmental Sciences, Nottingham Trent University, Nottingham, UK.

Related Concept Videos

Taping Over Different Ground Profiles01:12

Taping Over Different Ground Profiles

Taping over varying ground profiles requires careful adaptation to achieve accurate measurements. On smooth, level ground with minimal vegetation, the tape can rest directly on the ground. Here, the taping team, typically consisting of a head and a rear tapeman, coordinates their positions with clear communication. The rear tapeman holds the tape at the starting point and guides the head tapeman toward a range pole placed beyond the endpoint, using hand or voice signals to ensure alignment.On...
129
Elevation of Intermediate Points on Vertical Curves01:20

Elevation of Intermediate Points on Vertical Curves

Vertical curves are essential in roadway design because they provide smooth transitions between varying roadway grades. Designing vertical curves involves calculating intermediate elevations and identifying the curve's highest or lowest point, which is essential for optimal roadway performance.Intermediate elevations on a vertical curve are determined using the tangent offset method. This method considers the initial elevation at the start of the curve, the grades, and the curve's geometry. The...
85
Pumped Concrete01:13

Pumped Concrete

Concrete in large quantities can be pumped across long distances for placing in inaccessible sites. This system comprises a hopper that receives concrete from a mixer, a pump to propel the concrete, and pipelines that facilitate its delivery.
For direct-acting pumps, the concrete enters the pump via the inlet valve under the action of gravity and suction created by the movement of the piston. This concrete is then forced into the pipeline and out through the outlet valve by the forward movement...
144
Hydraulic Jump: Problem Solving01:16

Hydraulic Jump: Problem Solving

To analyze a hydraulic jump in a rectangular channel with a flow speed of 6 meters per second, follow these steps:Calculate Effective Upstream Velocity:When the downstream gate closes, a hydraulic jump forms, traveling upstream at 2 meters per second. This wave speed combines with the initial channel flow velocity, creating an effective upstream velocity.Identify Flow Velocities Before and After the Hydraulic Jump:Upstream of the hydraulic jump, the effective flow velocity includes both the...
199
Social Facilitation01:04

Social Facilitation

Not all intergroup interactions lead to negative outcomes. Sometimes, being in a group situation can improve performance. Social facilitation occurs when an individual performs better when an audience is watching than when the individual performs the behavior alone. This typically occurs when people are performing a task for which they are skilled.
33.6K
Design Example: Maintaining Level of an Embankment01:19

Design Example: Maintaining Level of an Embankment

Constructing a roadway embankment over uneven terrain requires precise leveling to ensure stability and proper drainage. Surveyors use a leveling instrument and staff to calculate ground elevations and determine the required fill material at each point along the embankment alignment.The process begins by positioning a leveling instrument near a benchmark with a known elevation. A backsight reading establishes the instrument height, which serves as a reference for subsequent measurements. A...
169