Related Experiment Video
Updated: Oct 9, 2025

A Virtual Simulation Experiment of Mechanics: Material Deformation and Failure Based on Scanning Electron Microscopy
Published on: January 20, 2023
Prediction of Material Failure Time for a Bucket Wheel Excavator Boom Using Computer Simulation
Andrei Andraș1, Sorin Mihai Radu1, Ildiko Brînaș1
1Department of Mechanical, Industrial and Transport Engineering, University of Petroșani, 332009 Petrosani, Romania.
Abstract:
Breakdown of stackers and excavators in opencast mines is possible because of operating, manufacturing and structural causes, and it produces high financial losses. These can be prevented by using various measures, including analyses and strength tests, with computerized modeling and simulation using FEA or other techniques being implemented in the recent years. In this paper a fatigue study is conducted on the boom of a BWE. Based on a computer model of the boom previously developed in SOLIDWORKS by our author team, first the modal analysis is conducted for three positions of the boom by studying the frequency response during the excavation process. This is followed by the time response determination corresponding to the maximum displacement frequency, in order to assess the stress during the excavation process, which causes the material fatigue in the boom structure. It was found that the maximum displacements appear when the BWE boom operates in a horizontal position. The aim was to estimate the period of time to failure in order to prevent unwanted accidents, and to develop a method that is applicable to any surface mining or industrial machine with similar structure.
Related Concept Videos
Fatigue
Pumped Concrete
For direct-acting pumps, the concrete enters the pump via the inlet valve under the action of gravity and suction created by the movement of the piston. This concrete is then forced into the pipeline and out through the outlet valve by the forward movement...
Applications of Stress
The...
Machines: Problem Solving II
Design Example: Creating a Hydraulic Model of a Dam Spillway
Transmission Shafts: Problem Solving
Next, use bending moment diagrams for the shaft to...

