Jove
Visualize
Contact Us
JoVE
x logofacebook logolinkedin logoyoutube logo
ABOUT JoVE
OverviewLeadershipBlogJoVE Help Center
AUTHORS
Publishing ProcessEditorial BoardScope & PoliciesPeer ReviewFAQSubmit
LIBRARIANS
TestimonialsSubscriptionsAccessResourcesLibrary Advisory BoardFAQ
RESEARCH
JoVE JournalMethods CollectionsJoVE Encyclopedia of ExperimentsArchive
EDUCATION
JoVE CoreJoVE BusinessJoVE Science EducationJoVE Lab ManualFaculty Resource CenterFaculty Site
Terms & Conditions of Use
Privacy Policy
Policies

Related Concept Videos

Steps in Outbreak Investigation01:18

Steps in Outbreak Investigation

246
In the ever-evolving field of public health, statistical analysis serves as a cornerstone for understanding and managing disease outbreaks. By leveraging various statistical tools, health professionals can predict potential outbreaks, analyze ongoing situations, and devise effective responses to mitigate impact. For that to happen, there are a few possible stages of the analysis:
246
Design Example: Analyzing Capacity Contours for Flood Risk Assessment01:17

Design Example: Analyzing Capacity Contours for Flood Risk Assessment

140
Flood risk assessment involves careful planning and analysis to ensure the safety of communities near water retention structures. Capacity contours are a vital tool in this process, as they illustrate the potential spread of water at specific levels in a given area. In the context of building a bund across a small valley, these contours play a critical role in evaluating the safety of nearby residential areas.In this example, the bund is intended to store stormwater in the valley. The engineers...
140
Prediction Intervals01:03

Prediction Intervals

2.4K
The interval estimate of any variable is known as the prediction interval. It helps decide if a point estimate is dependable.
However, the point estimate is most likely not the exact value of the population parameter, but close to it. After calculating point estimates, we construct interval estimates, called confidence intervals or prediction intervals. This prediction interval comprises a range of values unlike the point estimate and is a better predictor of the observed sample value, y. 
2.4K
Design Example: Creating a Hydraulic Model of a Dam Spillway01:21

Design Example: Creating a Hydraulic Model of a Dam Spillway

367
Scaled hydraulic models of dam spillways provide a practical way to replicate and study the intricate flow dynamics of these structures. Often built to a 1:15 ratio, these models allow for observing critical water behavior, such as velocity distribution, flow patterns, and energy dissipation.
367
Neural Regulation01:37

Neural Regulation

40.5K
Digestion begins with a cephalic phase that prepares the digestive system to receive food. When our brain processes visual or olfactory information about food, it triggers impulses in the cranial nerves innervating the salivary glands and stomach to prepare for food.
40.5K
Residuals and Least-Squares Property01:11

Residuals and Least-Squares Property

8.0K
The vertical distance between the actual value of y and the estimated value of y. In other words, it measures the vertical distance between the actual data point and the predicted point on the line
If the observed data point lies above the line, the residual is positive, and the line underestimates the actual data value for y. If the observed data point lies below the line, the residual is negative, and the line overestimates the actual data value for y.
The process of fitting the best-fit...
8.0K

You might also read

Related Articles

Articles linked to this work by shared authors, journal, and citation graph.

Sort by
Same author

Nonlinear dynamics of reservoir computing: Theory, realization, and application.

Chaos (Woodbury, N.Y.)·2026
Same author

Prediction performance of random reservoirs with different topology for nonlinear dynamical systems with different number of degrees of freedom.

Chaos (Woodbury, N.Y.)·2026
Same author

Data-driven performance measures using global properties of attractors for testing black-box surrogate models of chaotic systems.

Chaos (Woodbury, N.Y.)·2025
Same author

Computational memory capacity predicts aging and cognitive decline.

Nature communications·2025
Same author

Post-processing methods for delay embedding and feature scaling of reservoir computers.

Communications engineering·2025
Same author

Efficient optimisation of physical reservoir computers using only a delayed input.

Communications engineering·2025

Related Experiment Video

Updated: Oct 7, 2025

Watershed Planning within a Quantitative Scenario Analysis Framework
12:44

Watershed Planning within a Quantitative Scenario Analysis Framework

Published on: July 24, 2016

8.2K

Connecting reservoir computing with statistical forecasting and deep neural networks

Lina Jaurigue1, Kathy Lüdge2

  • 1Technische Universität Berlin, Institut für Theoretische Physik, Hardenbergstraße 36, 10623, Berlin, Germany. linajaurigue@tu-berlin.de.

Nature Communications
|January 12, 2022
PubMed
Summary

No abstract available in PubMed .

Related Experiment Videos

Last Updated: Oct 7, 2025

Watershed Planning within a Quantitative Scenario Analysis Framework
12:44

Watershed Planning within a Quantitative Scenario Analysis Framework

Published on: July 24, 2016

8.2K