Critical pathways of oral squamous cell carcinoma: molecular biomarker and therapeutic intervention

Sharmistha Dey1, Abhay Kumar Singh2, Abhinay Kumar Singh3

  • 1Department of Biophysics, All India Institute of Medical Sciences, Ansari Nagar, New Delhi, 110029, India. sharmistha_d@hotmail.com.

Related Concept Videos

Targeted Cancer Therapies02:57

Targeted Cancer Therapies

The targeted cancer therapies, also known as “molecular targeted therapies,” take advantage of the molecular and genetic differences between the cancer cells and the normal cells. It needs a thorough understanding of the cancer cells to develop drugs that can target specific molecular aspects that drive the growth, progression, and spread of cancer cells without affecting the growth and survival of other normal cells in the body.
There are several types of targeted therapies against...
7.9K
Cancer Therapies02:49

Cancer Therapies

Cancer therapies are various modes of treatment, such as surgery, radiation therapy, and chemotherapy that are administered to cancer patients.
However, cancer treatments can pose several challenges, as therapies used to kill cancer cells are generally also toxic to normal cells. Moreover, cancer cells mutate rapidly and can develop resistance to chemical agents or radiation therapy. Besides, all types of cancer cells may not respond to the same therapy. Some cancer cells respond to one...
8.0K
Combination Therapies and Personalized Medicine02:50

Combination Therapies and Personalized Medicine

Combining two or more treatment methods increases the life span of cancer patients while reducing damage to vital organs or tissue from the overuse of a single treatment. Combination therapy also targets different cancer-inducing pathways, thus reducing the chances of developing resistance to treatment.
The combination of the drug acetazolamide and sulforaphane is a good example of combination therapy to treat cancer. The cells in the interior of a large tumor often die due to the hypoxic and...
5.1K
Cancer-Critical Genes II: Tumor Suppressor Genes01:05

Cancer-Critical Genes II: Tumor Suppressor Genes

Genes usually encode proteins necessary for the proper functioning of a healthy cell. Mutations can often cause changes to the gene expression pattern, thereby altering the phenotype.
When the function of certain critical genes, especially those involved in cell cycle regulation and cell growth signaling cascades, gets disrupted, it upsets the cell cycle progression. Such cells with unchecked cell cycles start proliferating uncontrollably and eventually develop into tumors.
Such genes that act...
8.3K
Tumor Progression02:07

Tumor Progression

Tumor progression is a phenomenon where the pre-formed tumor acquires successive mutations to become clinically more aggressive and malignant. In the 1950s, Foulds first described the stepwise progression of cancer cells through successive stages.
Colon cancer is one of the best-documented examples of tumor progression. Early mutation in the APC gene in colon cells causes a small growth on the colon wall called a polyp. With time, this polyp grows into a benign, pre-cancerous tumor. Further...
6.6K
Treatment Resistant Cancers02:56

Treatment Resistant Cancers

Cancer is the second leading cause of death in the United States. A cancer cell is genetically unstable and hence can mutate faster. They can also modify their microenvironment and escape immune surveillance. The difficulties in treating cancer are further compounded by the emergence of rapid resistance to anticancer drugs. The most common ways to attain resistance in cancer cells include alteration in drug transport and metabolism, modification of drug target, elevated DNA damage response, or...
3.4K