The Optimization of Mix Proportion Design for SCC: Experimental Study and Grey Relational Analysis

Xinxin Ding1,2, Mingshuang Zhao1,2, Xue Qiu1

  • 1International Joint Research Lab for Eco-Building Materials and Engineering of Henan, School of Civil Engineering and Communications, North China University of Water Resources and Electric Power, Zhengzhou 450045, China.

Related Concept Videos

Design Example: Managing Concrete Workability01:14

Design Example: Managing Concrete Workability

This example deals with managing the workability of concrete for a raft foundation project under hot weather conditions. Workability is crucial for ensuring the concrete is easy to place, compact, and finish. In this scenario, a slump test — a common method to measure the workability of fresh concrete — initially indicated low workability. This was attributed to the rapid water loss from the concrete mix, exacerbated by the high temperatures causing the course aggregates to heat up.
130
Design Example: Aggregate Gradation01:24

Design Example: Aggregate Gradation

The right type and quality of aggregates are crucial for concrete as they significantly influence its properties, mix proportions, and cost-effectiveness. If different sources are available for sand, the commonly used fine aggregate in concrete, the selection of sand is primarily based on its gradation.
The grading, or particle-size distribution, of sand is determined using sieve analysis, with standard sizes ranging from 150 μm to 10 mm (ASTM No. 100 sieve to 3⁄8 in. sieve). Sand is...
156
Mixing Concrete01:30

Mixing Concrete

Concrete mixing ensures a homogenous blend where aggregates are well-coated with cement paste. Concrete mixing is typically done using two main types of mixers: batch and continuous. Batch mixers handle one batch at a time, thoroughly combining materials before discharging and receiving the next batch. In contrast, continuous mixers receive a steady flow of ingredients, mixing them consistently and discharging without interruption. Within batch mixers, tilting drum mixers mix with internal...
183
Mixing Time01:19

Mixing Time

The concept of mixing time is significant in producing a uniform concrete mix with the required strength. The mixing period starts once all components are in the mixer. Initially, the mixer is charged with 10% of the water, followed by the consistent addition of solids and then 80% of the water. The remaining water is added later, within the first quarter of the mixing period. The minimum mixing time varies according to the mixer's capacity; for example, mixers with up to 1 cubic yard...
253
Compacting Factor test01:22

Compacting Factor test

The compacting factor test is a method used to assess the workability of concrete. It is  especially suitable for concrete mixes containing aggregates up to one and a half inches in size. This test involves specialized equipment consisting of two truncated cone-shaped hoppers and a cylinder, all with polished interior surfaces to minimize friction.
The procedure begins by placing concrete into the upper hopper without any compaction. Once filled, the bottom door of this hopper is opened,...
287
Water Cement Ratio01:28

Water Cement Ratio

The water-cement ratio is pivotal in defining concrete's quality. This ratio, a balance between the weight of water and cement in the mix, shapes the concrete's strength, durability, and resistance to environmental factors. As identified by Abrams’ law, less water in the mix equates to stronger concrete. However, water is essential not only for the chemical process of hydration but also for the concrete's workability and compaction. While hydration chemically binds water and...