Related Experiment Video
Updated: Oct 1, 2025

14:55
Evaluating the Effect of Roadside Parking on a Dual-Direction Urban Street
Published on: January 20, 2023
3.5K
Mitigating bus bunching with real-time crowding information
Arkadiusz Drabicki1, Rafał Kucharski2, Oded Cats3
1Department of Transportation Systems, Cracow University of Technology, Kraków, Poland.
Summary
Real-time crowding information (RTCI) at bus stops encourages passengers to wait for less crowded buses, reducing bus bunching and improving the overall journey experience. This strategy effectively manages demand and decreases overcrowding.
Area of Science:
- Transportation Science
- Operations Research
- Human-Computer Interaction
Background:
- Bus bunching is a persistent issue in public transport, caused by a feedback loop involving headways, passenger numbers, and dwell times.
- Existing solutions often struggle to address the dynamic interplay of these factors effectively.
Purpose of the Study:
- To investigate if real-time crowding information (RTCI) at bus stops can mitigate bus bunching.
- To quantify the impact of RTCI on passenger waiting behavior and system performance.
Main Methods:
- Development of a boarding choice model incorporating RTCI, based on stated-preference survey data.
- Implementation of the model within a dynamic public transport simulation framework.
- Case study application to a major bus corridor in Warsaw, Poland.
Main Results:
- RTCI significantly increases the probability (30-70%) of passengers skipping overcrowded buses.
- This passenger behavior leads to reduced headway and load variations.
- Journey experience improves by 6%, with a 40% reduction in denied boardings and overcrowding.
Conclusions:
- RTCI is a viable demand management strategy to counteract bus bunching.
- Passenger willingness to wait, stimulated by RTCI, offers substantial system benefits even at low adoption rates.
- RTCI enhances public transport efficiency and passenger satisfaction.
Related Concept Videos
Bus Impedance Matrix
190
Calculating subtransient fault currents for three-phase faults in an N-bus power system involves using the positive-sequence network. When a three-phase short circuit occurs at a specific bus, the analysis uses the superposition method to evaluate two separate circuits.
In the first circuit, all machine voltage sources are short-circuited, leaving only the prefault voltage source at the fault location. The positive-sequence bus impedance matrix can be determined by solving the nodal equations,...
In the first circuit, all machine voltage sources are short-circuited, leaving only the prefault voltage source at the fault location. The positive-sequence bus impedance matrix can be determined by solving the nodal equations,...
190
Social Traps
23.8K
Social traps are negative situations where people get caught in a direction or relationship that later proves to be unpleasant, with no easy way to back out of or avoid. The concept was orignally introduced by John Platt who applied psychology to Garrett Hardin's "Tragedy of the Commons", where in New England herd owners could let their cattle graze in the common ground. This situation seems like a good idea, but an individual could have an advantage. If they owned...
23.8K
Multimachine Stability
244
Multimachine stability analysis is crucial for understanding the dynamics and stability of power systems with multiple synchronous machines. The objective is to solve the swing equations for a network of M machines connected to an N-bus power system.
In analyzing the system, the nodal equations represent the relationship between bus voltages, machine voltages, and machine currents. The nodal equation is given by:
In analyzing the system, the nodal equations represent the relationship between bus voltages, machine voltages, and machine currents. The nodal equation is given by:
244
Distributed Loads: Problem Solving
780
Beams are structural elements commonly employed in engineering applications requiring different load-carrying capacities. The first step in analyzing a beam under a distributed load is to simplify the problem by dividing the load into smaller regions, which allows one to consider each region separately and calculate the magnitude of the equivalent resultant load acting on each portion of the beam. The magnitude of the equivalent resultant load for each region can be determined by calculating...
780
Maximum Power Flow and Line Loadability
200
The maximum power flow for lossy transmission lines is derived using ABCD parameters in phasor form. These parameters create a matrix relationship between the sending-end and receiving-end voltages and currents, allowing the determination of the receiving-end current. This relationship facilitates calculating the complex power delivered to the receiving end, from which real and reactive power components are derived.
200
Buffer Effectiveness
50.8K
Buffer solutions do not have an unlimited capacity to keep the pH relatively constant . Instead, the ability of a buffer solution to resist changes in pH relies on the presence of appreciable amounts of its conjugate weak acid-base pair. When enough strong acid or base is added to substantially lower the concentration of either member of the buffer pair, the buffering action within the solution is compromised.
The buffer capacity is the amount of acid or base that can be added to a given volume...
The buffer capacity is the amount of acid or base that can be added to a given volume...
50.8K

