Related Experiment Video
Updated: Sep 30, 2025

Setting Up a Stroke Team Algorithm and Conducting Simulation-based Training in the Emergency Department - A Practical Guide
Published on: January 15, 2017
The importance of training transfer of non-technical skills safety training of construction workers
Karina Nielsen1, Kara Ng2, Dina Guglielmi3
1Sheffield University Management School, University of Sheffield, UK.
Abstract:
Safety training of migrant workers in construction has focused on technical skills with limited attention to non-technical skills, which support safety training transfer to the worksite, both immediately after training and in the long term. Using realist evaluation as our theoretical framework, this study explores the transfer of two key non-technical skills to construction sites: communication and decision-making. Trained workers completed questionnaires post-training and after six months. A moderated mediation model found an indirect link through training transfer between communication and decision-making skills immediately post-training and six months later. The results also revealed that high levels of safety self-efficacy moderated the relationship between communication, but not decision-making, safety skills post-training and the extent to which trained workers reported transferring these skills. The study has important practical implications, showing the significance of training transfer of non-technical skills, such as communication and decision-making, to the worksite.
Related Concept Videos
Survey Safety
Design Example: Managing Concrete Workability
Shotcrete
Mass Concreting
To reduce the risk of such cracking, the concrete mix may incorporate low-heat cement and pozzolans to reduce the temperature rise. Pre-cooled angular aggregates and water-reducing admixtures...
Placing Concrete
While placing concrete, care is taken to ensure that the concrete is laid in uniform layers, and hand shoveling and moving concrete using poker vibrators is avoided. Also,...
Quarrying of Stone
One common method involves using a diamond belt saw to cut large blocks from the quarry face. These blocks can be about 50 feet long and 12 feet high. After the initial vertical cut, drilling is performed at the base of the...

