Research on Dewatering Characteristics of Waste Slurry from Pipe Jacking Construction
Libing Jiang1, Liang Zhen2, Jianfeng Wang2
1Water Supply and Drainage Management Office, Zhenjiang 212008, China.
Abstract:
A large amount of waste slurry is produced during the construction of pipe jacking projects. To avoid the waste slurry occupying too much urban land, it needs to be rapidly reduced. Due to the complex composition of waste slurry, the existing dewatering methods face the problem of low efficiency, and the soil after dewatering is difficult to recycle as soil materials due to high water content and low strength. There is currently a lack of research on dewatering and resource utilization of waste slurry from pipe jacking projects. In response to this problem, this paper studies the flocculation-settling characteristics of waste slurry and the mechanical properties of solidified sediment. It was found that the anionic polyacrylamide (APAM) 7126 obtained the best separation effect if the waste slurry contains bentonite, which increases the zeta potential, resulting in poor separation. Thus, FeCl3·6H2O and APAM 7126 can be used as compound conditioners. The sediment after settling was further added with 20-30% sulphate aluminum cement (SAC), and the unconfined compressive strength of the solidified sediment for 3 days could exceed 30 kPa. After flocculation-settling and solidification treatment, the waste pipe jacking slurry can be quickly dewatered into a soil material with a certain strength, which provides a reference for engineering applications.
More Related Videos
06:10Extraction of Structural Extracellular Polymeric Substances from Aerobic Granular Sludge
Published on: September 26, 2016
08:09Wastewater Irrigation Impacts on Soil Hydraulic Conductivity: Coupled Field Sampling and Laboratory Determination of Saturated Hydraulic Conductivity
Published on: August 19, 2018
Related Concept Videos
Slump Test
Concrete is poured into the mold in three layers to conduct the test. Each layer is compacted 25 times with a steel tamping rod, which has a five-eighths-inch diameter and a rounded end, to ensure even distribution and eliminate...
Design Example: Managing Concrete Workability
Pumped Concrete
For direct-acting pumps, the concrete enters the pump via the inlet valve under the action of gravity and suction created by the movement of the piston. This concrete is then forced into the pipeline and out through the outlet valve by the forward movement...
Drying Shrinkage
A portion of this drying shrinkage can be reversed; if the concrete is...
Superplasticizers
Multiple Pipe Systems
Series Configuration
In a series configuration, fluid flows sequentially from one pipe...