A Review on Roller Compaction Quality Control and Assurance Methods for Earthwork in Five Application Scenarios
Qinglong Zhang1,2, Zaizhan An3, Zehua Huangfu4
1Department of Civil Engineering, School of Civil and Resource Engineering, University of Science and Technology Beijing, Beijing 100083, China.
Abstract:
Successful quality control and quality assurance (QC/QA) of earthwork compaction is critical to the long-term performance of roads, railways, airports, dams, and embankments. The purpose of this paper is to provide insights into the current practice, existing problems, challenges, and future development trends of QC/QA methods from the perspective of bibliometrics and the development stage. A bibliometric analysis is presented. Through quantitative analysis of literature and qualitative analysis of the development stage, insights into the current research practices and future directions of QC/QA methods have been derived from the perspectives of literature, cluster analysis, classification, different types of QC/QA methods, conclusions, and recommendations. It is found that the current QC/QA methods can be roughly divided into conventional compaction, digital rolling compaction, automatic rolling compaction, and intelligent control compaction. Currently, QC/QA methods are mainly confronted with the issues of accurate detection of compaction quality, autonomous optimization and intelligent decision-making of compaction process, multi-machine coordination, QC/QA-related specification formulation, and process standardization. To address these issues, several critical potential research directions are further identified: comprehensive CCI measurement system; simple and realistic mathematical representation of the complex compaction dynamics; parallel computing and distributed management of multi-source heterogeneous data; standardized application workflow and the cost-benefit assessment in the context of the full life cycle; intelligent control theories, methods, and technologies of earthwork compaction based on multidisciplinary integration. The paper enables researchers to obtain a comprehensive understanding of QC/QA methods for earthwork compaction as well as the suggested solutions for future work.
More Related Videos
Related Concept Videos
Compacting Factor test
The procedure begins by placing concrete into the upper hopper without any compaction. Once filled, the bottom door of this hopper is opened,...
Design Example: Managing Concrete Workability
Workability of Concrete
Concrete's workability is determined by its resistance to internal forces that arise...
Factors Affecting Workability
Slump Test
Concrete is poured into the mold in three layers to conduct the test. Each layer is compacted 25 times with a steel tamping rod, which has a five-eighths-inch diameter and a rounded end, to ensure even distribution and eliminate...
Placing Concrete
While placing concrete, care is taken to ensure that the concrete is laid in uniform layers, and hand shoveling and moving concrete using poker vibrators is avoided. Also,...