Manufacturing transfer and environmental efficiency: Evidence from the spatial agglomeration of manufacturing in

Jun Han1, Guoxiang Li2, Z Shen3

  • 1High-Quality Development Evaluation Institute, Nanjing University of Posts and Telecommunications, Nanjing, 210003, China.

Related Concept Videos

Production Efficiency01:01

Production Efficiency

Net production efficiency (NPE) is the efficiency at which organisms assimilate energy into biomass for the next trophic level. Due to low metabolic rates and less energy spent on thermoregulatory processes, the NPE of ectotherms (cold-blooded animals) is 10 times higher than endotherms (warm-blooded animals).
17.1K
Steel Manufacturing01:26

Steel Manufacturing

Steel manufacturing is a multi-stage process that begins by smelting iron ore into cast iron in a blast furnace. This initial stage involves layering iron ore with coke, a type of fuel, and crushed limestone within the furnace. The coke is ignited with a high volume of air, leading to the creation of carbon monoxide, which acts to reduce the iron ore to pure iron.
During this smelting process, limestone plays a crucial role by forming slag. Slag captures impurities within the molten iron, such...
858
Manipulation and Analysis01:21

Manipulation and Analysis

GIS manipulation and analysis functions are vital for decision-making and planning. These activities range from data retrieval tasks, such as selecting information based on specific criteria, to advanced analytical techniques that address complex spatial problems.One critical GIS analysis method is overlaying, which combines multiple data layers to examine impacts. For example, overlaying a river-dammed lake boundary with road networks can identify affected infrastructure. Another common...
73
Power Factor Correction01:20

Power Factor Correction

The power transmission to a factory involves the transfer of apparent power, a combination of active and reactive power. The power factor measures how effectively electrical power is converted into useful work output. The ratio of the real power (KW) that does the work to the apparent power (KVA) supplied to the circuit.
281