Using Connected Vehicle Trajectory Data to Evaluate the Impact of Automated Work Zone Speed Enforcement.

Jijo K Mathew1, Howell Li1, Hannah Landvater2

  • 1Department of Civil Engineering, Purdue University, 207 S Martin Jischke Dr, West Lafayette, IN 47907, USA.

Summary

Automated work zone speed enforcement significantly improves driver compliance. Speeding decreased in work zones with enforcement, though speeds rebounded shortly after.

Related Concept Videos

Design Example: Alignment of a Road Line Using GIS01:17

Design Example: Alignment of a Road Line Using GIS

The alignment of a road line using Geographic Information Systems (GIS) is a critical process in civil engineering, combining advanced technology with practical decision-making. This methodology begins with the collection of geospatial data, including information on land cover, geomorphology, drainage patterns, slope, and contour details. Such data is typically acquired through satellite imagery and GIS tools, offering a comprehensive understanding of the terrain.Once the data is gathered, it...
118
Relative Motion Analysis - Velocity01:24

Relative Motion Analysis - Velocity

A stroke engine has a slider-crank mechanism that converts rotational motion from the crank into linear motion of the slider or vice versa. This mechanism consists of three main parts: the crank, the connecting rod, and the slider.
When an external force is exerted, it sets the crank into a rotational movement. This, in turn, instigates the motion of the connecting rod, leading to what is referred to as a general plane motion. This process involves two key points - point A on the connecting rod...
454
Relative Motion Analysis - Acceleration01:10

Relative Motion Analysis - Acceleration

A slider-crank mechanism converts rotational motion from the crank into linear motion of the slider or vice versa. This mechanism consists of three main parts: the crank, the connecting rod, and the slider. The movement of the slider-crank is an example of general plane motion as the fluctuating angle between the crank and the connecting rod. Consider a segment AB where point A is at the end of the slider and point B is on the diametrically opposite end to point A, on a crack. The variance in...
445
Work and Energy for Variable Forces01:10

Work and Energy for Variable Forces

When an object is acted upon by a variable force, the amount of work done and the change in energy of the object can be more complex to calculate compared to when a constant force is applied. Work is the product of force and displacement, while energy is the capacity of a system to do work. When a constant force is applied to an object, the work done can be calculated as the product of the force and the distance moved in the direction of the force. However, when a variable force is applied, the...
4.0K
Relative Motion Analysis using Rotating Axes - Acceleration01:22

Relative Motion Analysis using Rotating Axes - Acceleration

Consider a component AB undergoing a linear motion. Along with a linear motion, point B also rotates around point A. To comprehend this complex movement, position vectors for both points A and B are established using a stationary reference frame. The absolute velocity of point B is determined by adding the absolute velocity of point A, the relative velocity of point B in the rotating frame, and the effects caused by the angular velocity within the rotating frame.
Time differentiation is...
414
Survey Safety01:28

Survey Safety

Surveying near highways, rough terrain, or power lines involves significant risks. Working along highways is particularly dangerous and requires the use of warning signs and flagmen. It is safest to avoid working directly on roads and use offsets whenever possible. When highway work is unavoidable, it must follow all safety guidelines. Surveyors should wear bright clothing, such as orange reflective vests, to ensure visibility to motorists, coworkers, and hunters. In construction zones, wearing...
188