Related Experiment Video
Updated: Sep 23, 2025

A Uniaxial Compression Experiment with CO2-Bearing Coal Using a Visualized and Constant-Volume Gas-Solid Coupling Test System
Published on: June 12, 2019
Study of water-conducting fractured zone development law and assessment method in longwall mining of shallow coal
Xiaobin Li1, Dongliang Ji2, Penghua Han1
1School of Energy and Mining Engineering, China University of Mining and Technology-Beijing, Beijing, 100083, China.
Abstract:
Starting from the source of mining, scientific understanding of surface damage law and assessment method in longwall mining of shallow coal seam is conducive to solving the problems of geological hazards and deterioration of the ecological environment, and promoting the coordinated development of efficient coal mining and environmental protection. Based on numerical simulation and theoretical analysis, the surface damage process and spatiotemporal evolution of fracture field are discussed. The influencing factors and assessment method of surface damage are clarified. The results show that surface damage undergone the immediate roof caving stage, the fracture and instability stage of main roof, the spatial amplification stage of separation layer, the instability stage of surface damage control layer and the mining damage stability stage. Under the critical extraction condition, the cracks above the goaf are divided into the crack area outside the cut, the crack area inside the cut, the re-compaction area in the middle goaf, the crack area behind the longwall face, and the crack area in front of the longwall face. The overburden reaches critical failure ahead of surface critical mining. The sensitivity of loose layer thickness to surface subsidence coefficient is greater than that of mining thickness to surface subsidence coefficient. Surface damage control should be adjusted to local conditions, and finally realize zoning treatment and zoning repair. Through the three-step method of "longwall face rapid advancing method, local grouting reinforcement overburden method and zoning treatment ground fissures method", the surface damage control of 12,401 longwall face is realized. This research provides theoretical guidance and application value for surface ecological restoration in similar mining area.
Related Concept Videos
Quarrying of Stone
One common method involves using a diamond belt saw to cut large blocks from the quarry face. These blocks can be about 50 feet long and 12 feet high. After the initial vertical cut, drilling is performed at the base of the...
Plane Potential Flows
Uniform...
Water and Mineral Acquisition
Design Example: Managing Concrete Workability
Microcracking in Concrete