High Throughput Priority-Based Layered QC-LDPC Decoder with Double Update Queues for Mitigating Pipeline Conflicts

Yunfeng Li1, Yingchun Li1, Nan Ye1

  • 1Key Laboratory of Specialty Fiber Optics and Optical Access Networks, Joint International Research Laboratory of Specialty Fiber Optics and Advanced Communication, Shanghai University, Shanghai 200444, China.

Related Concept Videos

Fast Decoupled and DC Powerflow01:24

Fast Decoupled and DC Powerflow

The fast decoupled power flow method addresses contingencies in power system operations, such as generator outages or transmission line failures. This method provides quick power flow solutions, essential for real-time system adjustments. Fast decoupled power flow algorithms simplify the Jacobian matrix by neglecting certain elements, leading to two sets of decoupled equations:
305
Parallel Processing01:20

Parallel Processing

The brain processes sensory information rapidly due to parallel processing, which involves sending data across multiple neural pathways at the same time. This method allows the brain to manage various sensory qualities, such as shapes, colors, movements, and locations, all concurrently. For instance, when observing a forest landscape, the brain simultaneously processes the movement of leaves, the shapes of trees, the depth between them, and the various shades of green. This enables a quick and...
254
Leaky Scanning02:28

Leaky Scanning

During most eukaryotic translation processes, the small 40S ribosome subunit scans an mRNA from its 5' end until it encounters the first start AUG codon. The large 60S ribosomal subunit then joins the smaller one to initiate protein synthesis. The location of the translation initiation is largely determined by the nucleotides near the start codon as there may be multiple translation initiation sites present on the mRNA.  Marilyn Kozak discovered that the sequence RCCAUGG (where R...
5.3K
LC Circuits01:21

LC Circuits

An LC circuit consists of an inductor and a capacitor, either in series or parallel. Consider a charged capacitor connected with an inductor in series. Before the switch is closed, all the energy of the circuit is stored in the electric field of the capacitor. When the switch is closed, the capacitor begins to discharge, producing a current in the circuit. The current, in turn, creates a magnetic field in the inductor. Because of the induced emf in the inductor, the current cannot change...
2.7K
Uniform Depth Channel Flow: Problem Solving01:18

Uniform Depth Channel Flow: Problem Solving

To calculate the flow rate for a trapezoidal channel, first, identify the bottom width, side slope, and flow depth of the channel. The cross-sectional area (A) corresponding to the depth of flow (y), channel bottom width (B), and side slope (θ) is determined by:Next, calculate the wetted perimeter, which includes the bottom width and the sloped side lengths in contact with the water. Using the values of the cross-sectional area and the wetted perimeter, determine the hydraulic radius by...
132
Block Diagram Reduction01:22

Block Diagram Reduction

The process of deriving the transfer function of a control system often involves reducing its block diagram to a single block. This simplification can be achieved through a series of strategic operations, including relocating branch points and comparators. These operations preserve the overall function of the system while allowing for easier manipulation and combination of blocks.
The first step in this process is the identification and relocation of a branch point. A branch point, where a...
303