Automated Dimension Estimation of Steel Pipes Stacked at Construction Sites Using Euclidean Distances Calculated by

Yoon-Soo Shin1, Junhee Kim1

  • 1Department of Architecture, College of Engineering, Dankook University, 152 Jukjeon-ro, Yongin-si 16890, Gyeonggi-do, Korea.

Related Concept Videos

Bending of Material: Problem Solving01:09

Bending of Material: Problem Solving

In this lesson, determine the ratio of the maximum bending moments applied to two metal pipes, given that both pipes can withstand a maximum stress of 100 MPa. Both pipes have an outer radius of 1.8 cm. Pipe A has an inner radius of 1.5 cm, and Pipe B has an inner radius of 1 cm. The ratio of the maximum bending moment applied to two metallic pipes, each with a different inner and outer radius, is determined by considering their dimensions. The inner radius of the first pipe is 1.5 cm, and for...
242
Distance Measurements by Taping01:18

Distance Measurements by Taping

Tapes are essential in surveying for accurate, durable, and short-distance measurements. Made from lightweight, nylon-coated steel, they offer flexibility and strength for rugged outdoor use. The nylon coating protects against rust and wear, extending the tape's life. Standard lengths, around 30 meters, are marked in meters and millimeters for precision.Surveyors select tapes based on site conditions and accuracy needs. Lightweight, nylon-coated tapes are commonly used for ease of handling and...
94
Design Example: Measuring Distance Between Two Points with Obstructions01:10

Design Example: Measuring Distance Between Two Points with Obstructions

When measuring distances in areas with physical obstructions, such as a lake in a field, surveyors must employ techniques to calculate accurate lengths without direct line measurements. One effective method is the offset technique, which allows for precise distance estimation over inaccessible stretches.In this scenario, a surveyor must measure a side of an area that crosses a lake. Since the measuring tape cannot span the lake, the surveyor begins by establishing a baseline that aligns with...
116
Distance Corrections01:15

Distance Corrections

To achieve precise distance measurements, especially in surveying and construction, certain corrections must be applied to account for potential sources of error like the standardization errors, temperature variations, and slope adjustments.Standardization error emerges when measurement equipment undergoes changes, such as wear, repairs, or weather impacts. To address this, surveyors compare the equipment’s readings to a standard. This process identifies any deviation that might lead to...
81
Multiple Pipe Systems01:21

Multiple Pipe Systems

Multipipe systems consist of complex configurations of interconnected pipes designed to transport fluids efficiently across intricate networks. They are essential in engineering applications requiring precise control over flow distribution, pressure, and head loss. They are categorized into series, parallel, loop, and network configurations, each distinguished by unique flow characteristics and applications.
Series Configuration
In a series configuration, fluid flows sequentially from one pipe...
832
Structural Steel Products01:24

Structural Steel Products

Structural steel products are created within a structural mill. The process begins with a beam blank that is reheated and then fed through a series of rollers. These rollers progressively shape the metal into its final form. Adjusting the spacings between the rollers allows for the production of different sections with the same nominal dimensions.
Once shaped, the steel's final form emerges as a continuous length, which is then segmented by a hot saw into manageable pieces. These segments...
352